Qualcomm researchers move into new campus buildings

January 01, 2007 |

Construction is complete on Qualcomm's Building W Campus, a 909,170-sf, three-building campus and parking structure located in San Diego. Designed by Delawie Wilkes Rodrigues Barker, San Diego, the new campus will facilitate on-site research, development, engineering, and testing of computer chips for wireless devices. The campus, which is designed to meet LEED standards, encompasses a 12-story, 411,950-sf engineering office facility (pictured), a two-story chip-testing facility, a 4.6-megawatt co-generation plant, and a 372,465-sf, seven-story parking garage. Burkett & Wong was the structural engineer, Walsh Engineers the mechanical engineer, and Roel Construction the general contractor. All are based in San Diego.

 

Add new comment

Your Information
Your Comment

Filtered HTML

  • Web page addresses and e-mail addresses turn into links automatically.
  • Allowed HTML tags: <a> <em> <strong> <cite> <blockquote> <code> <ul> <ol> <li> <dl> <dt> <dd>
  • Lines and paragraphs break automatically.

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
Refresh Type the characters you see in this picture. Type the characters you see in the picture; if you can't read them, submit the form and a new image will be generated. Not case sensitive.  Switch to audio verification.
Overlay Init