flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Ultimate underlayment

Ultimate underlayment


August 11, 2010
This article first appeared in the 200810 issue of BD+C.

Floor underlayment can be poured up to 60 days before the building's permanent windows and doors are installed. Designed for use in buildings with light-gauge steel frame construction, Levelrock CSD Early Exposure can be applied over corrugated steel decks, giving Building Teams an economical means of designing mid-rise buildings up to 10 stories high. The hybrid cementitious underlayment features compressive strengths from 3,500 to 5,000 psi and can withstand the rigors of trade traffic.

USG Corp.

Input No. 206 at BDCnetwork.com/quickResponse

boombox1 - default
boombox2 -
native1 -
halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021