Insulated panels reduce waste, installation time

Premier structural insulated panels by Insulfoam provide an alternative to stick-built framing and other construction methods for multifamily structures and commercial buildings. Large section panels reduce installation time and job site labor, while reducing construction waste by up to two-thirds. The panels provide a tight building envelope that can reduce heating and cooling use by up to 60%, says the maker.

         
 

RELATED ARTICLES FROM BD+C

Comments on: "Insulated panels reduce waste, installation time"