
Oversees projects ranging from $11 million (St. John the Apostle Catholic Church, Leesburg, Va.) to $38 million (Hylton Performing Arts Center, Manassas, Va.) Responsible for budget and schedule refinements, procurement strategies, value engineering, and construction oversight.
As lead researcher for Virginia Tech Structural Engineering Laboratory, performed “push-out” tests to analyze behavior and strength of crimped deck joint in composite design.
Experienced with residential, commercial, educational, religious, and international embassy projects with exposure to concrete, steel, wood, and masonry design.
Interned with Clark Construction Group (2002), worked on design and construction of USA Today/Gannett headquarters.