flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Oakland apartments: sustainable, but affordable, too

Oakland apartments: sustainable, but affordable, too


By Sam Oches, Editorial Intern | August 11, 2010
This article first appeared in the 200808 issue of BD+C.
Located in downtown Oakland, Calif., the Madison @ 14th Apartments offer 59 affordable housing units for low-income families and 20 units for former foster care youth who have reached adulthood. Photos: Jay W. schneider
          
The $30 million Madison @ 14th Apartments, located in downtown Oakland, Calif., opened its doors in June as a sustainable mixed-use development.
Designed by Leddy Maytum Stacy Architects, San Francisco, and developed by Affordable Housing Associates, Berkeley, the eight-story, 79,000-sf rental complex incorporates 2,700-sf of ground-floor retail
            
Rooftop photovoltaic panels will provide 35-40% of the building’s energy, while high-efficiency lighting will help minimize energy usage.
          
space with 59 affordable housing units for low-income families and 20 units for former foster care youth who have reached adulthood.
Green features include photovoltaic solar panels that provide 35-40% of the building's energy; high-efficiency lighting; and a hydronic heating system that provides hot water and space heat. Recycled nylon carpet, durable carpet tiles, and linoleum floors made from linseed oil and cork (with a 40-year life-span) were specified. About 75% of the project's construction waste was recycled. The project was designed to meet LEED Silver, although cost considerations are keeping the developer from seeking official certification.

Other distinctive design elements include a central core seismic structural system that allows for maximum flexibility and large window openings and a structured garage outfitted with a Wöhr Autopark Systeme, a concealed, triple-stacked system that allows more cars to be parked in a smaller area. Gaining approval for the parking structure required significant negotiation with the city of Oakland.
        



 

boombox1 - default
boombox2 -
native1 -
halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021