flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

New Richmond High School Awaits LEED Silver Certification

New Richmond High School Awaits LEED Silver Certification


By Staff | August 11, 2010

ATS&R planners, architects and engineers Minneapolis, MN, and the New Richmond, WI, School District are awaiting LEED silver certification for the New Richmond High School designed by ATS&R.

Specifically designed for "green construction," the 295,000-square-foot new facility incorporates many sustainable features and elements, including maximization of open space; quantity and quality control in stormwater design; joint use of facilities; water-use reduction and water-efficient landscaping; optimization of energy performance (30+ above code); use of recycled and regional materials; use of low-emitting volatile organic compounds; occupancy lighting control with motion detectors for classrooms and hallways; air-flow control with motion detectors; energy recovery system for classroom ventilation; variable air-volume systems for thermal comfort; carbon-dioxide monitoring and control; modular condensing boilers and variable-speed pumping for cooling and heating water; innovations in green cleaning products and processes; and low-maintenance finishes such as police concrete floors.

This green focus could lead to silver-level LEED certification, according to Daniel Moll, ATS&R's Project Administrator. ATS&R says New Richmond High School would be among a few elite schools in the nation to have LEED for Schools Certification.

boombox1 - default
boombox2 -
native1 -
halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021