The Riverside County Transportation Commission's 1,065 parking space, six-story concrete structure for Metrolink riders in Corona, CA, is on course for completion. The new concrete building will have two entrances, two exits, two elevators, plus a connecting bridge to an over-crossing. The total station parking capacity when construction is completed will be some 1,415 spaces, with the existing lot nearby.
|