KlingStubbins and Tocci awarded GSA contract for nationwide BIM services

KlingStubbins and Tocci Building Corporation announced they have been selected as a prime contractor team to participate in a $30M, five-year contract to provide Building Information Modeling (BIM) Services for the U.S. General Services Administration (GSA). KlingStubbins and Tocci will provide design and construction related BIM consulting services for new and renovation projects on Federal buildings located in the New England, Northeast & Caribbean, Mid-Atlantic, Washington DC, Rocky Mountain, Pacific Rim and Northwest and Arctic GSA regions. Task orders expected will include multi-disciplinary building information modeling, design and construction analysis, cost and schedule analysis, laser scanning and surveying, and BIM training and support program development.

Tocci and KlingStubbins developed and submitted the competitive proposal with select co-partners; all of whom are industry recognized leaders in BIM-enabled design, construction and engineering related services. Partners include Autodesk, Inc.; Bentley Systems Incorporated; EMCOR Group companies; Faithful + Gould; J.C. Cannistraro Inc.; Metco Services; Raymond L. Goodson, Jr., Inc.; Simpson Gumpertz & Heger; WSP Group Companies.

KlingStubbins provides professional services in all major disciplines within the realm of architecture, engineering, interiors, planning, and landscape architecture. The firm consists of more than 450 professionals in its Philadelphia, PA; Cambridge, MA; Raleigh, NC; San Francisco, CA; Washington, DC; and Beijing, China offices. Its areas of market focus and specialization include Corporate/Commercial, Government, Science + Technology, Higher Education, Hospitality/Entertainment, Institutional/Civic, Mission Critical, and Healthcare. The company is a nationally recognized leader in sustainable design and an innovator in project delivery.

Tocci Building Corporation, Woburn, MA, is a premier construction services firm established in 1922 that provides integrated project delivery (IPD), design/build and construction management services to national and regional clients building throughout the East Coast regions of the United States. The firm, a leader in application of advanced construction technologies including building information modeling (BIM), builds commercial, residential and institutional projects valued from $10M - $200M.

         
 

Comments on: "KlingStubbins and Tocci awarded GSA contract for nationwide BIM services "

The colorful ribboned flooring at Toronto’s Corus Quay mimics the iconic corkscr
The colorful ribboned flooring at Toronto’s Corus Quay mimics the iconic corkscr
Discussions of commercial flooring tend to focus on the floor covering or finish material. This is hardly surprising, since the covering is the part of the floor that stakeholders see, interact with, and care about most. The...
The use of light load-bearing glass to create transparent stairs, floors, and ot
The use of light load-bearing glass to create transparent stairs, floors, and ot
Glass has taken on new life in recent building years. Long valued for its transparency and lightness, glass is now also being considered for its structural and protective capabilities. Beyond the technique known as...
Building owners must plan ahead for roof replacement to avoid emergency leak rem
Building owners must plan ahead for roof replacement to avoid emergency leak rem
No building owner wants to be caught unprepared by catastrophic roof failure. Emergency roof replacements tend to be more expensive than planned ones, and damage to interiors may mean unrecovered costs and detrimental...
AIA: New Developments in Concrete Construction
AIA: New Developments in Concrete Construction
Concrete has long been a reliable building material for commercial and institutional projects. Yet recent trends, including the growth in hospitality and urban rental project starts, as well as mixed-use towers and transit-...
AIA Rainscreens BD+C DEcember 2011
AIA Rainscreens BD+C DEcember 2011
Until recently, it has been lighting, mechanical, and control system upgrades which have received the most attention in the green building movement. At long last, the industry is now recognizing building enclosures as a long...
Brick and stone masonry have served as reliable and valuable elements of commercial building projects for centuries, gracing urban and rural landscapes since time immemorial. Building Teams have trusted clay brick to bring...
Making the Most of the Reconstruction Boom Reconstruction in its many forms—tenant improvements, retail fitouts, adaptive reuse, historic preservation, gut rehab, and so on—is keeping many design and construction firms...
The topic of water shortages is nothing new, as cities around the globe struggle with drought, water quality, supply constraints, and failing infrastructures. However, the idea of new plumbing codes and design standards...
Guard booths, stations and shelters are defense strategy linchpins, becoming increasingly integral to perimeter defense planning. Before evaluating the efficacy of different guard booth configurations, and before selecting a...
From the company that brought you Construction Computing Magazine’s 2011 BIM Product of the Year ArchiCAD 15, the “Get There Faster with ArchiCAD” whitepaper examines five critical areas to explore before making your final...
Download Complete White Paper Download Introduction Download Chapters 1-4Defining Net-Zero Energy Buildings
Our seventh White Paper on Green Buildings focuses on the role of water in sustainable design and construction. The editors conclude with a set of 21 detailed recommendations for the consideration of the Building Teams, home...