flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Idea Center at Playhouse Square: A better idea

Idea Center at Playhouse Square: A better idea

Nonprofit groups in Cleveland team up to create an innovative, energy-efficient space inside a historic downtown structure, bringing greater exposure to the arts.


By Barbara Horwitz-Bennett | August 11, 2010
This article first appeared in the 200610 issue of BD+C.



Through a unique partnership between a public media organization and a performing arts/education entity, a historic building in the heart of downtown Cleveland has been renovated as a model of sustainability and architectural innovation.

Old Suffolk County Courthouse
PHOTO: KEVIN REEVES PHOTOGRAPHY

Playhouse Square, which had been working for more than 30 years to revitalize the city's arts district, teamed up with ideastream, a newly formed media group that combined public TV station WVIZ/PBS and FM radio station WCPN, to create a novel, inventive space for the performing arts, education programs, and radio broadcasting, as well as leased office space.

Local A/E firm Westlake Reed Leskosky (WRL) and the Cleveland office of URS Corp. got to work integrating a trendy, open design—and one that would save energy—into the existing structure.

The facility's main architectural feature is its transparency and openness, which exposes the center's cultural and educational activities to downtown Cleveland traffic. Restoring the storefront created “a simple, clean opening” to the activity within the center for passersby, notes Christopher Diehl, AIA, URS's VP and director of design.

Starting with the building's entry, an inverted canopy was designed to welcome visitors into a glass-enclosed vestibule where dance and broadcast/recording studios are easily visible. Colored cables, electronics, motors, and sound and light systems are exposed to add to the excitement of a backstage studio environment. The entry vestibule guides visitors to the historic lobby, with its ornamental staircase leading to a mezzanine, with its restored balustrade and new glass floor.

Old Suffolk County Courthouse
Floor-to-ceiling glass walls put the facility’s dance and broadcast/recording studios on display, adding to the vibrancy of the interior space.
PHOTO: KEVIN REEVES PHOTOGRAPHY

“The existing mezzanine landing was a dark and oppressive form overhead as one entered the lobby,” says Diehl. “We felt it was critical to the entry and journey experience to remove the brooding heaviness overhead, and open up the landing on both sides. The result is a space that feels much lighter and one that allows the activity to be viewed on all sides.”

Further inside, activities on multiple floors are connected, physically and visually, through deep wells and stairways cut into the building. Large windows, designed according to the size, proportion, and geometry of the original windows, take advantage of federal Historic Rehabilitation Tax Credits.

Robert L. Selby, FAIA, associate professor, School of Architecture, University of Illinois at Urbana-Champaign, commends the project for its sense of openness. “I like the way it gives high visibility to the arts,” he says.

Adding to the culturally vibrancy of the building is a state-of-the-art, 300-seat production theater, a new construction suspended over an existing loading dock and service alley. Featuring a collapsible, portable seating system, as well as customized floor construction and dual lighting to support both television and theatrical productions, the black-box space posed unique structural challenges.

Westlake Reed Leskosky, serving also as structural engineer, took the approach of maintaining the load path from the existing floor plate and columns to the foundations of the existing concrete structure. This eliminated the need to remove the first- and second-floor interior columns and floor slabs, or to redirect load transfer to the foundations; it also made it possible to suspend the new theater from the existing structure, with minimal new columns underneath, in order to maintain vehicle circulation underneath the studio.

Beyond the technical details, the real brilliance of the new theater is the efficiencies captured by space sharing.

“Playhouse Square needed a theater, ideastream needed a media studio, and both organizations have an educational mission,” notes Kathryn P. Jensen, ideastream's COO. “By integrating the two purposes, we saved what would have separately cost us $7 million.”

Having multiple high-tech tenants in a building will often create waste, because each wants to maintain separate systems for power distribution, heating and cooling, and other basic components, notes WRL associate and mechanical engineer Matthew Murphy, PE. With its central plant and shared systems and infrastructure, Idea Center creates architectural and engineering synergies that lead to lower operating costs and higher efficiency. The project earned a Silver rating under the U.S. Green Building Council's LEED-CI (commercial interiors) program.

To support the radio stations and high-tech tenants, the facility houses a robust and redundant power distribution, UPS backup, and ground and standby generator systems. EMI shielding protects the sensitive high-frequency communication cables from magnetic fields emitted by the distribution systems.

To meet high acoustical requirements (NC-15, as opposed to NC 40-45 for typical offices), motorized equipment and transformers are isolated, cooling equipment is sited in a remote location, distribution ductwork is lined with acoustical material, and ductwork distribution pathways are designed in large sections with circuitous routes to allow for noise dissipation and lower velocity airflow.

The true success of the Idea Center, however, is the vibrancy it is contributing to the Playhouse Square district. As lead designer Paul E. Westlake, Jr., FAIA, put it, “The fabric woven here is the cloth of community culture.”

Related Stories

Cultural Facilities | Apr 8, 2024

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.

Cultural Facilities | Mar 27, 2024

Kansas City’s new Sobela Ocean Aquarium home to nearly 8,000 animals in 34 habitats

Kansas City’s new Sobela Ocean Aquarium is a world-class facility home to nearly 8,000 animals in 34 habitats ranging from small tanks to a giant 400,000-gallon shark tank. 

Cultural Facilities | Mar 26, 2024

Renovation restores century-old Brooklyn Paramount Theater to its original use

The renovation of the iconic Brooklyn Paramount Theater restored the building to its original purpose as a movie theater and music performance venue. Long Island University had acquired the venue in the 1960s and repurposed it as the school’s basketball court.

Museums | Mar 25, 2024

Chrysler Museum of Art’s newly expanded Perry Glass Studio will display the art of glassmaking

In Norfolk, Va., the Chrysler Museum of Art’s Perry Glass Studio, an educational facility for glassmaking, will open a new addition in May. That will be followed by a renovation of the existing building scheduled for completion in December.

Museums | Mar 11, 2024

Nebraska’s Joslyn Art Museum to reopen this summer with new Snøhetta-designed pavilion

In Omaha, Neb., the Joslyn Art Museum, which displays art from ancient times to the present, has announced it will reopen on September 10, following the completion of its new 42,000-sf Rhonda & Howard Hawks Pavilion. Designed in collaboration with Snøhetta and Alley Poyner Macchietto Architecture, the Hawks Pavilion is part of a museum overhaul that will expand the gallery space by more than 40%.

Performing Arts Centers | Feb 27, 2024

Frank Gehry-designed expansion of the Colburn School performing arts center set to break ground

In April, the Colburn School, an institute for music and dance education and performance, will break ground on a 100,000-sf expansion designed by architect Frank Gehry. Located in downtown Los Angeles, the performing arts center will join the neighboring Walt Disney Concert Hall and The Grand by Gehry, forming the largest concentration of Gehry-designed buildings in the world.

Giants 400 | Feb 8, 2024

Top 20 Public Library Construction Firms for 2023

Gilbane Building Company, Skanska USA, Manhattan Construction, McCownGordon Construction, and C.W. Driver Companies top BD+C's ranking of the nation's largest public library general contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report. 

Giants 400 | Feb 8, 2024

Top 30 Public Library Engineering Firms for 2023

KPFF Consulting Engineers, Tetra Tech High Performance Buildings Group, Thornton Tomasetti, WSP, and Dewberry top BD+C's ranking of the nation's largest public library engineering and engineering/architecture (EA) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

Giants 400 | Feb 8, 2024

Top 50 Public Library Architecture Firms for 2023

Quinn Evans, McMillan Pazdan Smith, PGAL, Skidmore, Owings & Merrill, and Gensler top BD+C's ranking of the nation's largest public library architecture and architecture/engineering (AE) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

Giants 400 | Feb 8, 2024

Top 35 Performing Arts Center and Concert Venue Construction Firms for 2023

The Whiting-Turner Contracting Company, Holder Construction, McCarthy Holdings, Clark Group, and Gilbane Building Company top BD+C's ranking of the nation's largest performing arts center and concert venue general contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021