Most Recent Features

Oct 13, 2010
The SL82 structurally glazed folding glass system from NanaWall can be used for openings up to 39 feet wide. The system features a single track with bottom-supported rollers; hinges and rollers are adjustable.
Oct 13, 2010
A SmartPlate water-to-water SP33 heater and 200-gallon boiler-side buffer tank from AERCO International saved the Chelmsford (Mass.) High School more than $5,000 a year in domestic hot water expenses.
Oct 13, 2010
Sclater Partners Architects designed the 107-foot steel-framed Bellevue Skybridge using Ronstan Tensile Architecture stainless steel cables. The corrosion-resistant cables require little maintenance or paint.
Oct 13, 2010
The newest products featured in BD+C.
Oct 13, 2010
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
Oct 13, 2010
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
Oct 13, 2010
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public...
Oct 13, 2010
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.
Oct 13, 2010
Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.
Oct 13, 2010
Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and...
Oct 13, 2010
The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.
Oct 13, 2010
The $4.8 million Lewis and Clark Confluence Tower in Hartford, Ill., commemorates explorers Meriwether Lewis and William Clark at the point where their trek to the Pacific Ocean began—the confluence of the Mississippi and Missouri...
Oct 13, 2010
The new $120 million Meritus Regional Medical Center in Hagerstown, Md., has 267 beds, 17 operating rooms with high-resolution video screens, a special care level II nursery, and an emergency room with 53 treatment rooms, two trauma rooms...
Oct 13, 2010
William R. Hough Hall is the new home of the Warrington College of Business Administration at the University of Florida in Gainesville. The $17.6 million, 70,000-sf building gives students access to the latest technology, including a lab...
Oct 13, 2010
The new Kluge-Moses Science Building at Piedmont Virginia Community College, in Charlottesville, is part of a campus update designed and managed by the Lukmire Partnership. The 34,000-sf building is designed to be both a focal point of the...