Most Recent Features

BCA
Dec 20, 2011
This publicly available document is applicable to most building types and distills the long list of guidelines, and longer list of tasks, into easy-to-navigate activities that represent the ideal commissioning process.
Aragon Construction 568 Broadway Foursquare
Dec 20, 2011
The modern, minimalist build-out will have elements of the foursquare “badges” in different aspects of the space, using glass, steel, and vibrantly painted gypsum board.
HOAR Construction new office Austin, Texas
Dec 20, 2011
Major projects in central Texas spur firm’s growth.
Dec 19, 2011
Renovation provides state-of-the-art waterfront facility.
Aqua Building Chicago
Dec 19, 2011
Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.
Dec 19, 2011
The 130,000 square foot building is being completely renovated.
USGBC Board of directors
Dec 19, 2011
Board responsible for articulating and upholding the vision, values, mission of organization.
Davis Construction
Dec 19, 2011
The new offices will total 490,998 square feet in a 10-story building with two wings of 25,000 square feet each. 
Dec 19, 2011
Annual USC Lusk Center for Real Estate forecast reveals signs of slow market recovery.
Dec 16, 2011
The sustainable building solution, built for approximately $255-sf, features innovative materials and intelligent building systems that align with the mission of integration and collaboration. 
Dec 16, 2011
The project converted the landmark structure listed on the National Register of Historic Places into the Town of Babylon History Museum at Old Town Hall.
On average, green schools save about $100,000 a year on operating costs, includi
Dec 15, 2011
On average, green schools save about $100,000 a year on operating costs, including energy and water savings.
LEED solar PVs construction worker risks
Dec 15, 2011
Workers on these projects suffer a 24% increase in falls to lower levels during roof work, which researchers attributed to the installation of solar panels, and a few other risks.
Maine governor Paul LePage.
Dec 15, 2011
The FSC program is administered through the Leadership in Energy and Environmental Design (LEED) and requires wood to be harvested in a sustainable way.
Dec 15, 2011
Block sizes initially were limited to a maximum perimeter of 1,750 feet, with no side of the block being longer than 500 feet.