News

Most Recent in News University Buildings

The new UIHC clinic includes a larger and more centralized space for research, b
March 28,2012

The new cancer clinic provides a significant increase in patient space from the prior facility, which was located in an adjacent building.

March 28,2012

Firm will spearhead strategies for transforming existing in-patient hospital into state-of-the-art ambulatory care facility.

Construction is now under way on the Valencia College West Campus Building 10, a
March 27,2012

Project led by design-build team of SchenkelShultz Architecture and McCree General Contractors, both of Orlando.

The $110 million Math and Science Building occupies the area immediately east of
March 26,2012

Designed by Architects | Delawie Wilkes Rodrigues Barker, the new San Diego Mesa College Math and Science Building will provide new educational...

The 25,493-sf Emergency Department at Mercy Medical Center-North Iowa was built
March 21,2012

New Emergency Department features a "racetrack" design with a central nurses' station encircled by 19 private patient examination rooms and 2...

Photovoltaic panels atop the Knight Management Center at the Stanford Graduate S
March 20,2012

The 360,000-sf facility underscores what is taught in many of the school’s electives such as Environmental Entrepreneurship and Environmental...

The new Baylor Medical Center at Waxahachie facility will be organized within a
March 19,2012

Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring,...

March 14,2012

Building will house research into personalized, gene-based cancer screening and treatment.

Site constraints led to the configuration of the building as a continuous ribbon
March 06,2012

The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.

JJC’s Facility Services Building is part of a $220 million master plan aimed at
March 06,2012

With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services Building combines high-performance technologies...