School Construction

The colorful ribboned flooring at Torontos Corus Quay mimics the iconic corkscr
April 03, 2012 | By C.C. Sullivan, Contributing Editor

Laying the foundation for good design.

The design for Red Hawk Elementary School stems from the desire to create a vibr
April 03, 2012 | By BD+C Staff

Illumination Series panels made for a trouble-free, quick installation at a cost-effective price....

read more
The $110 million Math and Science Building occupies the area immediately east of
March 26, 2012 | By BD+C Staff

Designed by Architects | Delawie Wilkes Rodrigues Barker, the new San Diego Mesa College Math and...

read more
Site constraints led to the configuration of the building as a continuous ribbon
March 06, 2012 | By BD+C Staff

The second phase of the project, which includes the academic buildings and the lacrosse and footb...

read more
Sean ODonnell AIA, LEED AP
March 05, 2012 | By BD+C Staff

O’Donnell will continue the leadership and tradition of creative design established by firm Chair...

read more
February 02, 2012 | By BD+C Staff

The Bridgeland Elementary School will be a new prototype school for the District. Designed to mee...

read more
January 31, 2012 | By BD+C Staff

Located adjacent to the existing elementary school, the $28 million, 82,000 s/f Pre-K to eighth G...

read more
January 27, 2012 | By BD+C Staff

Construction manager Sordoni Construction Co. along with the design team of Payette Architects an...

read more
January 26, 2012 | By BD+C Staff

Passive design principles give form to a sustainable, restorative environment for the children of...

read more
January 04, 2012 | By BD+C Staff

Construction is scheduled to begin in June 2012, and will be completed by December 2012.

January 03, 2012 | By BD+C Staff

The new award, which comprises the construction of five new elementary schools and demolition of...

read more
January 03, 2012 | By BD+C Staff

Harley Ellis Devereaux will relocate the employees in its current Berkeley, Calif., office to the...

read more
December 27, 2011 | By BD+C Staff

Once completed, the new building addition will double the size of the data center which houses so...

read more
University of Texas at Dallas USGGBC Green Schools 2011
December 27, 2011 | By BD+C Staff

Recipient schools and regions from across the nation - from K-12 to higher education - were recog...

read more
Photovoltaic systems solar panels schools
December 21, 2011 | By BD+C Staff

The report examines the two primary types of ownership models used to obtain PV installations for...

read more
December 19, 2011 | By BD+C Staff

Renovation provides state-of-the-art waterfront facility.

December 14, 2011 | By BD+C Staff

Nominate a colleague, peer, or even yourself. ...

read more
Tyler Junior College wanted a roofing system that wouldnt need any attention fo
December 14, 2011 | By BD+C Staff

Tyler Junior College wanted a roofing system that wouldn’t need any attention for a long time....

RJM Construction Nova Classical Academy St. Paul
December 05, 2011 | By BD+C Staff

As the general contractor, RJM is constructing the 94,000-sf building that will consolidate the S...

read more
Green school house LEED Platinum Phoenix
December 01, 2011 | By BD+C Staff

Phoenix public school receives the generous gift of a state-of-the-art building for student and c...

read more
Griffin Electric Cary Arts Center fire pump chiller handler elevators
November 14, 2011 | By BD+C Staff

 

The Griffin Electric team was responsible for replacing the previous electrical service...

read more
November 11, 2011 | By Jeff Yoders, Contributing Editor

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround...

read more
November 10, 2011 | By BD+C Staff

New Perkins School for the Blind Building is dedicated to innovation, interaction, and independen...

read more
November 04, 2011 | By BD+C Staff

Despite rain delays and scope changes, the $96.7 million high school was completed nearly two-mon...

read more
October 14, 2011 | By BD+C Staff

Van H. Gilbert architects enhances sustainability credentials.

October 07, 2011 | By BD+C Staff

To track results, schools will use the newly developed Sustainability Dashboard, a unique web-bas...

read more
September 23, 2011 | By BD+C Staff

The Living Building Challenge requires projects to meet a stringent list of qualifications, inclu...

read more
September 12, 2011 | By Jeff Yoders, Contributing Editor

 

The Los Angeles Community College District requires every design-build team in its massi...

read more
September 07, 2011 | By BD+C Staff

The project was one of three to win the award in the category of Architectural/Non-Residential. ...

Sloan School of Management
December 21, 2010 | By Peter Fabris, Contributing Editor

University architects representing four prominent institutions of higher learning tell how your f...

read more
Overlay Init