Latest

Latest in New Project Portfolios

Sprout Space, a modular template designed by Perkins+Will, is a high-performance
on August 30,2013 in Feature

With budget, space needs, and speed-to-market pressures bearing down on school districts, modular classroom assemblies are often a go-to solution...

The design and construction of the hospital’s 42-foot-high, 60,000-sf mechanical
on May 01,2013 in Feature

The Building Team for the 23-story Lurie Children’s Hospital in Chicago implements an integrated BIM/VDC workflow to execute a complex vertical...

on April 16,2013 in Feature

From an orchid-shaped visitor center to California’s largest public works project, each of these projects benefited from IMP technology.

on April 10,2013 in Feature

Charter schools are growing like Topsy. But don’t jump on board unless you know what you’re getting into.

Due to open in August 2013, the West Branch library in Berkeley, Calif., replace
on March 27,2013 in Feature

The Building Team for Berkeley, Calif.’s new 9,500-sf West Branch library aims to achieve net-zero—and possibly net-positive—energy performance...

on March 20,2013 in Feature

Single-glazed storefronts in the student center at California’s West Valley College were replaced with aluminum-framed, thermally broken windows...

on January 04,2013 in Feature

New high school football stadium touches down at Texas school district; botanical gardens visitors center achieves net-zero energy status; and...

on January 04,2013 in Feature

New L.A. Fire Station makes sparks along Hollywood Boulevard; senior memory care center opens its doors to Wisconsin communities; and expansion...

on January 04,2013 in Feature

Minneapolis mausoleum adds space for above-ground burials; University of Houston parking garage connects commuters to campus; and Nashville bridge...

on October 13,2012 in Feature

Hong Kong’s pre-certified LEED Platinum building; 36,000-sf academic building at Middlesex County College; UC San Diego parking structure.