Latest

Latest in Modular Building

on April 30,2013 in Feature

Kate Steel of Steel Consulting Services offers tips and advice for choosing the correct code-compliant glazing product for every fire-rated...

on December 09,2012 in Feature

Greenbuild attendees share their thoughts with BD+C on the SAGE modular classroom.

The classroom’s exterior cladding consisted of fiber cement boards of varying co
on December 09,2012 in Feature

SAGE modular classroom opens eyes, minds at Greenbuild 2012.

The facility combines a specialized therapy room or “vault” to house the TomoThe
on September 28,2012 in Feature

By using modular construction and strategic site design, RAD Medical Systems built the first radiation center to receive LEED certification.

During the construction of Mountaineer Hall, 129 modules were set and sealed in
on September 19,2012 in Feature

By using modular construction, the university was able to open a dorm a full year earlier than a similar dorm built at the same time with...

330 MacDougal Street, Brooklyn, NY. 85 modules forming 65 studio apartments and
on July 09,2012 in Feature

A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12...

on September 12,2011 in Feature

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living...

Five Award-winning Modular Innovations
on July 22,2011 in Feature

The Modular Building Institute's 2011 Awards of Distinction highlight fresh ideas in manufactured construction projects.

on March 11,2011 in Feature

Anderson Anderson Architecture of San Francisco designed the Harvard Yard childcare facility, a modular building manufactured by Triumph Modular...

on February 18,2011 in Product Review

A modular elevator was added to the Jesuit High School in Carmichael, Calif., as part of the private college preparatory school’s...

on October 13,2010 in Feature

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have...

on August 11,2010 in Product Review
Tasked with designing a ticket booth for Florida Atlantic University's new arena, B.I.G. Enterprises, a manufacturer of prefabricated, blast-...
on August 11,2010 in Feature
Today’s best K-12 schools are embracing the sustainability ethos in their design and construction, and that can mean a healthier, more comfortable...
on August 11,2010 in Feature
27. Next-Generation Green Roofs Sprout up in New York New York is not particularly known for its green roofs, but two recent projects may put the Big...
on August 11,2010 in Feature
University construction spending is 13% higher than a year ago—mostly for residence halls and infrastructure on public campuses—and is expected to...
on August 11,2010 in Feature
At nine stories, the Stadthaus apartment complex in East London is the world’s tallest residential structure constructed entirely in timber and one...
on August 11,2010 in Feature

11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is...

on August 11,2010 in Feature
1. Riverwalk Transforms Chicago's Second Waterfront Chicago has long enjoyed a beautiful waterfront along Lake Michigan, but the Windy City's second...
on August 11,2010 in Feature
Over a five-day stretch last December, students at the Carroll School in Lincoln, Mass., witnessed the installation of a modular classroom building...
on August 11,2010 in Column
You know things are bad when even healthcare construction is hurting. Some AEC firms are projecting that healthcare work, the jewel in the...