Latest

Latest in K 12 Schools

The classroom’s exterior cladding consisted of fiber cement boards of varying co
on December 09,2012 in Feature

SAGE modular classroom opens eyes, minds at Greenbuild 2012.

Cambridge Lakes Learning Center
on November 19,2012 in Feature

In Pingree Grove, Ill., DRH Cambridge Homes selects modular construction for the creation of the Cambridge Lakes Learning Center, home of a new...

College Park Elementary School, Virginia Beach, Va., has an integrated wetland g
on November 11,2012 in Feature

High-performance schools put ‘sustainability’ in the lesson plan

SuperLite II-XL 120 fire resistive glazing
on October 22,2012 in Feature

New school’s south-facing elevation features a glazed aluminum curtain wall that incorporates PPG Solarblue and PPG Solarban 60 glazing.

Classroom at Ross (Calif.) School with balanced daylighting. School districts ar
on September 07,2012 in Feature

When educators and school administrators describe their vision for new K-12 school buildings as ‘21st-century learning spaces,’ they’re not...

“Leap,” by artist Lawrence Argent, at Sacramento International Airport. A key co
on July 20,2012 in Feature

Ranking the leading firms in Architecture, Engineering, and Construction.

The $29 million Lady Bird Johnson Middle School, in Irving, Texas, is—at 152,000
on July 20,2012 in Feature

The Giants 300 Top 25 AEC Firms in the K-12 Schools Sector.

The MBCI NuRoof Retrofit Roof System was installed over the existing roof’s fram
on May 21,2012 in Feature

Metal Roof Consultants attended a school board meeting and presented a sloped metal retrofit roof as an alternative to tearing off the existing...

on May 07,2012 in Product Review

When the design team DLR Group, Minneapolis, was ready to recommend wall panels for an Edison charter school in chilly Duluth, Minn., it wanted...

on September 12,2011 in Feature

 

The Los Angeles Community College District requires every design-build team in its massive modernization program to use BIM, but what...