Latest
Latest in Higher Education
The winners of the 2013 Building Team Awards show that great buildings cannot be built without the successful collaboration of the Building Team....
Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation.
Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science.
This course provides step-by-step prescriptive advice to architects, engineers, and contractors on when it makes sense to repair or rehabilitate...
Increasingly, college and university research buildings are doing double duty as homes for K-12 STEM programs. Here’s how to create facilities...
When embarking upon a roofing renovation project, one of the first decisions for the Building Team is whether to tear off and replace the existing...
Kate Steel of Steel Consulting Services offers tips and advice for choosing the correct code-compliant glazing product for every fire-rated...
From an orchid-shaped visitor center to California’s largest public works project, each of these projects benefited from IMP technology.
To achieve the goals of sustainability and high performance, stakeholders in new construction and renovation projects must rein in energy...
If you do hotels, schools, student unions, office buildings, performing arts centers, transportation facilities, or any structure with a lobby,...
The nation’s thousand-plus community college districts can be a steady source of income for your Building Team—provided you appreciate the special...
More and more colleges and universities see sustainainably designed buildings as a given
Reconstruction centered on Building 91.1, a historic (1937) five-story former machine shop, with its distinctive façade of glass blocks, many of...
By using modular construction, the university was able to open a dorm a full year earlier than a similar dorm built at the same time with...
Ranking the leading firms in Architecture, Engineering, and Construction.
Architects were able to create a 2-hour exit enclosure/stairwell that provided vision and maximum fire safety using fire rated glazing that...
Seegers Student Union at Muhlenberg College has been reconstructed to serve as the core of social life on campus.
The architecture team from Jospeh Bellomo Architects was able to use the concrete as a design element, eliminating water seepage, efflorescence,...
How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility....
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.