News

Most Recent in News Healthcare Buildings

The new 28,000-sf Mount Auburn Healthcare Facility located in Waltham, Mass. is
April 04,2012

HDS Architecture provided design services for all the Mount Auburn Healthcare suites including coordination of HVAC and FP engineering.

As part of the Baystate Medical Center, Suffolk Construction adhered to the sust
April 03,2012

Construction management firm awarded emergency department project for successful build of $296 million MassMutual Wing and Davis...

The new UIHC clinic includes a larger and more centralized space for research, b
March 28,2012

The new cancer clinic provides a significant increase in patient space from the prior facility, which was located in an adjacent building.

March 28,2012

Firm will spearhead strategies for transforming existing in-patient hospital into state-of-the-art ambulatory care facility.

Jones Lang LaSalle teamed with HKS Architects of Dallas and contractors Weigand
March 26,2012
Hospital ushers in new era of local access to advanced medical treatments in Northeast Indiana.
The 25,493-sf Emergency Department at Mercy Medical Center-North Iowa was built
March 21,2012

New Emergency Department features a "racetrack" design with a central nurses' station encircled by 19 private patient examination rooms and 2...

The new Baylor Medical Center at Waxahachie facility will be organized within a
March 19,2012

Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring,...

March 14,2012

Building will house research into personalized, gene-based cancer screening and treatment.

The CLC at Danville consists of two 7,500 sf buildings—named Freedom House and L
March 06,2012

Residences at VA Danville to provide community-centered housing for military veterans.

The Keller Army Community Hospital Clinic at the United States Military Academy
February 29,2012

The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide...

February 29,2012

The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care...

February 28,2012

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.

The phase two, 13,500-square-foot addition was performed by McCarthy on a compac
February 28,2012

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing...

Griffin Electric performed the installation of a 15KV service and switches, as w
February 28,2012

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University....

Michael Bohn (Gilbane), Stephanie Mueller (Gilbane), Gene Farb (Elmhurst Memoria
February 22,2012

The project employed more than 2,000 tradespeople for a total of 2.1 million hours worked – all without a single lost-time accident. 

JAX Genomic Medicine, a new nonprofit institute for genomics-based personalized
February 14,2012

Gilbane to manage program for new genomic medicine facility that will create 300 jobs in Connecticut.

February 13,2012

Located in the Simon Building, which serves as the main entrance leading into the Morristown Memorial Hospital campus, the project comprises three...

February 13,2012

SOM’s design for the 838-bed, three-million-square foot complex creates a new standard for medical care in the region.

Healthcare respondents overwhelmingly believe that better facilities will streng
February 10,2012

The 2012 Mortenson Construction Healthcare Industry Study includes insights and perspectives regarding government program concerns, the...

January 31,2012

Leading construction management firm overseeing one of first healthcare projects in the country to utilize innovative IPD process.