News

Most Recent in News Building Materials

April 17,2012

The guide profiles 322 institutions of higher education in the U.S. and Canada that demonstrate notable commitments to sustainability in their...

April 17,2012

Given the rapid transformations occurring in the federal construction sector, FMI examines the key forces accelerating these changes, as well as...

April 17,2012

Alberici has been honored by the ASA eight times in the award’s nineteen-year history--more than any other general contractor in its class.

Jason Freeland
April 16,2012

Recently named to Building Design+Construction’s 40 Under 40 Class of 2012.

April 16,2012

The result, the researchers say, could be technologies capable of cutting the carbon footprint created by the huge power demands buildings place...

Construction on UNT’s new facility began in July 2011. A ribbon cutting ceremony
April 16,2012

Lab to test energy technologies and systems in order to achieve a net-zero consumption of energy.

The MOU proposed the purchase of 900 megawatts of renewable energy generating eq
April 16,2012

The project, “Rajasthan Sun Technique Energy Private Limited,” is a subsidiary of Reliance Power and is being co-financed by the Asian Development...

Connecting with the Regenstein Hall of Music, the building enables the Bienen Sc
April 13,2012

The showcase facility is the recital hall, an intimate, two-level space with undulating walls of wood that provide optimal acoustics and lead to...

The project consisted of 8,372 modules including 196 LED carport lights using ap
April 12,2012

Project contractor Oltman Construction noted that the carport provides shaded area for 940 car stalls and generates 2 MW DC of electric power.

Medical Office Building #2 at the St. Anthony's Medical Campus in Lakewood, Colo
April 10,2012

Designed by Davis Partnership Architects, P.C., Medical Plaza 1 and 2 are four-story structures totaling 96,804-sf and 101,581-sf respectively.