Latest

Latest in Building Owner

City Hall, as viewed through historic City Hall Park . Designed by architects Jo
on October 04,2012 in Feature

New York's City Hall last received a major renovation nearly a century ago. Four years ago, a Building Team led by construction manager Hill...

on October 04,2012 in Feature

Presenting 11 projects that represent the best efforts of distinguished Building Teams in historic preservation, adaptive reuse, and renovation...

A firefighter uses the voice capabilities of a fire alarm panel (in this case, a
on October 04,2012 in Feature

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

To date, $5.2 billion worth of live projects have used MySmartPlans, including m
on October 04,2012 in Feature

As building projects have grown in scope and complexity, so, too, has the task of document management. A new online tool is helping Building Teams...

HMC volunteers install planters in a vertical garden wall at the Second Harvest
on October 04,2012 in Feature

HMC employees give back to their communities through toy drives and fundraising efforts like CANstruction, which benefits local food banks.

Four HMC professionals who were recently promoted to Associate talk about their
on October 04,2012 in Feature

Architecture firm take a multifaceted approach to professional development.

A Cal Poly Pomona student helps children at Santa Monica’s McKinley Elementary S
on October 04,2012 in Feature

Founded in 2009 with an initial endowment of $1.9 million, HMC’s nonprofit Designing Futures Foundation (DFF) has donated about $230,000 in its...

on October 04,2012 in Column

The American Institute of Architects has issued its triennial Survey Report of Firm Characteristics, “The Business of Architecture,” which...

The facility combines a specialized therapy room or “vault” to house the TomoThe
on September 28,2012 in Feature

By using modular construction and strategic site design, RAD Medical Systems built the first radiation center to receive LEED certification.

During the construction of Mountaineer Hall, 129 modules were set and sealed in
on September 19,2012 in Feature

By using modular construction, the university was able to open a dorm a full year earlier than a similar dorm built at the same time with...