Building Team

April 09, 2012 | By BD+C Staff

See how your firm ranks among the AEC industry leaders. 

As part of the Baystate Medical Center, Suffolk Construction adhered to the sust
April 06, 2012 | By BD+C Staff

Construction management firm awarded emergency department project for successful build of $296 mi...

read more
The new 28,000-sf Mount Auburn Healthcare Facility located in Waltham, Mass. is
April 06, 2012 | By BD+C Staff

HDS Architecture provided design services for all the Mount Auburn Healthcare suites including co...

read more
The Flat Tower design is based on a medium-height dome structure that covers a l
April 06, 2012 | by Beth Buczynski

A team of French designers unveil the “Flat Tower” design, a second place winner in the 2011 eVol...

read more
April 06, 2012 | By BD+C Staff

The April Forum, titled “Declare your Independence!” will feature educational sessions on topics...

read more
The CLEAN LA Solar program will allow local property owners to sell solar power
April 06, 2012 | By BD+C Staff

Los Angeles Business Council applauds decision allowing LADWP to create new national model for ro...

read more
April 06, 2012 | By BD+C Staff

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

The complex was designed to meet the business and operational goals of a world-c
April 06, 2012 | By BD+C Staff

Home stadium for Lekhwiya Club a vibrant addition to Doha’s architectural identity.

Originally the Elephant House at the St. Louis Zoo, Peabody Hall was renovated i
April 05, 2012 | By Sue Bady, Contributing Editor

An exclusive tip sheet to help the Building Team manage door and window retrofits successfully....

A patient room at Methodist Womens Hospital, Omaha, Neb. HDR Architecture desig
April 05, 2012 | By Peter Fabris, Contributing Editor

The healthcare design and construction picture has been muddied by uncertainty over the new healt...

read more
April 05, 2012 | By BD+C Staff

Check out these helpful apps for everyday design and construction tasks.

Our favorite: Mag...

read more
The design for Red Hawk Elementary School stems from the desire to create a vibr
April 04, 2012 | By BD+C Staff

Illumination panels made for a trouble-free, quick installation at a cost-effective price.

Jim Bald
April 04, 2012 | By BD+C Staff

Bald has 13 years of experience in the glazing industry, coming to Harmon from Trainor where he w...

read more
The complex, located within the Aqueduct Racetrack complex, will contribute appr
April 04, 2012 | By BD+C Staff

Aqueduct Racetrack complex transformed into modern entertainment destination.

Energy savings at the Eagle Veterinary Hospital are close to 50% compared with a
April 04, 2012 | By BD+C Staff

Middleman Construction Company builds the city?s first commercial building to earn certification....

Ala Hason
April 04, 2012 | By BD+C Staff

Hason specializes in planning and urban design, hospitality, office, corporate headquarters and t...

read more
April 03, 2012 | By Nicole Bowling, Associate Editor

Two new PV systems; a lighter shelf; and fire alarm/emergency communication system.

The colorful ribboned flooring at Torontos Corus Quay mimics the iconic corkscr
April 03, 2012 | By C.C. Sullivan, Contributing Editor

Laying the foundation for good design.

April 03, 2012 | By BD+C Staff

Brownell, who was named a BD+C 40 Under 40 in 2006, provides insight regarding emerging material...

read more
April 03, 2012 | By BD+C Staff

Shuttered since 2008, the plant produces clear and tinted float glass serving architectural glass...

read more
InterContinental Shimao Shanghai Wonderland is expected to extend 19 stories int
April 03, 2012 | By Raemin Zhang, cnngo.com

Would you spend $300 a night to sleep underground? You might, once you see the designs for China'...

read more
April 03, 2012 | By BD+C Staff

Report covers JM’s long-time sustainability fo...

read more
The design for Red Hawk Elementary School stems from the desire to create a vibr
April 03, 2012 | By BD+C Staff

Illumination Series panels made for a trouble-free, quick installation at a cost-effective price....

read more
April 02, 2012 | By BD+C Staff

Website offers online continuing education courses registered with the American Institute of Arch...

read more
John Hazlett, Director of Sustainability, City of Indianapolis; Greg Ballard, Ma
April 02, 2012 | By BD+C Staff

Emmitt J. Bean Federal Center project team for...

read more
Mitsubishi Electric newly developed a control cable that is 20% lighter than the
April 02, 2012 | By BBC

The operation of the elevator is scheduled to begin in 2014.

The City Creek Center is a $1.5 billion mixed-use development in downtown Salt L
April 02, 2012 | By BD+C Staff

Sachse was hired to complete store build-outs at City Creek Center.

Robert L. Culver
April 02, 2012 | By BD+C Staff

Culver will work closely with Sasaki firm leaders on issues of strategy, marketing, and business...

read more
The Riviera Point development will result in the creation of 441 jobs from the c
April 02, 2012 | By BD+C Staff

Riviera Point Holdings breaks ground on $17 million office center.

For the renovation of Mitchell Hall at the University of New Mexico (designed by
March 30, 2012 | By Sue Bady, Contributing Editor

With their improved aesthetics, energy efficiency, and durability, replacement windows and doors...

read more
Overlay Init