Architects

Every building starts with a concept and a design. Architects are involved at every stage of the process, even after a design has been finalized, helping other building team members through the snares and missteps in the construction process.

The project is designed to be a model for green development and is seeking a LEED Silver rating. Green features include water-sa

October 17, 2011 | By BD+C Staff

Complex sits on a four-acre waterfront site along Lady Bird Lake with spectacular city and lake v...

read more

CertainTeed will utilize Aerialogics aerial measurement technology across a host of corporate applications and provide customiz

October 17, 2011 | By BD+C Staff

 

CertainTeed to provide Aerialogics’ Aerial Measurement Services to its credentialed cont...

read more

Big D's Arizona and Nevada locations will carry Johnsonites Tarkett Collection of resilient sheet, tile and planks, as well as

October 17, 2011 | By BD+C Staff

Strategic partnership expands offering to south and west coast customers. 

Public universities tend to have the most sophisticated plans, including three or more types of communications platforms.

October 17, 2011 | By BD+C Staff

 

“Detailed Analysis of U.S. College and University Annual Clery Act Reports” study now av...

read more

USGBC-LA's Inaugural Sustainable Innovation Awards will recognize exceptional achievement and innovation in each LEED category f

October 17, 2011 | By BD+C Staff

 

Chapter to presents inaugural Sustainable Innovation Awards,

The EDC senses a voltage drop from a regular lighting circuit and automatically turns lights on to full brightness after transfe

October 17, 2011 | By BD+C Staff

The emergency lighting control devices require fewer maintenance costs and testing requirements t...

read more

AISC holds the view that open standards will never be able to transfer every piece of data a user or client may want, or indeed

October 14, 2011 | By BD+C Staff

AISC is working to bring that vision to reality by developing a three-step interoperability strat...

read more

The Science and Math Learning Center anticipates a 24% reduction in energy use as compared to a similar building, at an annual s

October 14, 2011 | By BD+C Staff

Van H. Gilbert architects enhances sustainability credentials.

October 14, 2011 | By BD+C Staff

In a recent survey conducted by Building Design+Construction, more than 75% of responden...

read more
The ACI and CRSI anchor training program is expected to be ready by the end of 2

The ACI and CRSI anchor training program is expected to be ready by the end of 2011.

October 14, 2011 | By BD+C Staff

Adhesive anchor installer certification required in new ACI 318-11.

Black and Dew combines professionals from multiple construction and contracting disciplines to work on governmental, institution

October 14, 2011 | By BD+C Staff

 

Merger is aimed at increasing market sector capabilities and building on communication a...

read more

The curvilinear substructure expresses the regions sporting past and land form. METHOD Design wedded a 3D structural model (opp

October 12, 2011 | By Jeff Yoders, Contributing Editor

The Louisiana State Sports Hall of Fame celebrates the sporting past, but it took innovative 3D p...

read more

Improved energy efficiency is a key feature of the latest escalator models. Variable-speed escalators like this one automaticall

October 12, 2011 | By Susan Bady, Contributing Editor

Elevators and escalators have been re-engineered to help building owners reduce energy consumptio...

read more

Each cluster of open workstations at Russell Investment Headquarters, Seattle, is located near an innovation hub that offers p

October 12, 2011 | By Peter Fabris, Contributing Editor

Office designs are adjusting to dramatic changes in employee work habits. Goodbye, cube farm. Hel...

read more

Bulley & Andrews is celebrating 120 years in the construction business.

October 12, 2011 | By BD+C Staff

The family-owned and operated general contractor attributes this significant milestone to the str...

read more

Due to be completed in November of 2012, the $11.4 million Bigelow Center for Ocean Health (COH) will be one of three complement

October 12, 2011 | By BD+C Staff

 

Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by W...

read more

The AIA Contract Documents program continues to revise existing documents and develop new documents and guides, as necessary, to

October 11, 2011 | By BD+C Staff

These new documents will be available in the first quarter of 2012 as part of the new AIA Contrac...

read more

For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Shop, 100% of the proceeds will be donated

October 11, 2011 | By BD+C

 

For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Sh...

read more

The claim for ThyssenKrupp Elevator Americas was validated using the California Department of Public Health (CDPH) Standard Meth

October 11, 2011 | By BD+C

The conclusive and independent third-party validation process is another step toward a green prod...

read more

The Commercial Real Estate Recovery Group merges Ballards distressed real estate capabilities with the firms established skill

October 11, 2011 | By BD+C Staff

 

The new group represents an expansion of the company’s Distressed Real Estate Initiative...

read more

Onex intends to offer a portion of this co-investment to its third-party limited partners.

October 11, 2011 | By BD+C Staff

With the completion of the JELD-WEN investment, Onex Partners III is approximately 40% invested....

DR Partnership Program will reach thousands of commercial buildings to educate, promote and drive participation in demand respon

October 07, 2011 | By BD+C Staff

 

Program will use USGBC’s newly revised LEED Demand Response credit as an implementation...

read more

Otis will install permanent-magnet gearless elevators, which require less space in the building and feature the companys energy

October 07, 2011 | By BD+C Staff

 

Wins reinforce Otis’ position as leader in energy-efficient products.

UL ISR 102 provides detailed requirements with which to evaluate the environmental impacts related to producing a variety of doo

October 07, 2011 | By BD+C Staff

 

ASSA ABLOY Trio-E door is the first to be certified to these sustainability requirements...

UL Environment, Inc., released a White Paper to help educate all stakeholders about Environmental Product Declarations (EPDs) an

October 07, 2011 | By BD+C Staff

 

White paper defines EPD, details development process, and identifies emerging trends for...

read more

The NCE escalator is the first to offer as standard a complete, all-in-one package of green features, including regenerative d

October 07, 2011 | By BD+C Staff

The energy-efficient NCE escalator from Otis offers customers substantial “green” benefits.

To track results and progress of the programs, students affiliated with the International Knowledge & Research Center for Green

October 07, 2011 | By BD+C Staff

To track results, schools will use the newly developed Sustainability Dashboard, a unique web-bas...

read more

Precast, transparent concrete panels can brighten any room and allow people to see images and objects behind them.

October 07, 2011 | By BD+C Staff

 

The panels allow interior lights to filter through, from inside. 

Trades jobs (carpenters, HVAC/boilermakers, electricians, concrete/cement masons, and plumbers) are expected to see the greatest

October 07, 2011 | By BD+C Staff

Green jobs are already an important part of the construction labor workforce, and signs are that...

read more

Dow Corning 758 Sealant was highlighted in Building Design+Constructions (BD+C) GreenZone Modular High-Performance Medical Fac

October 07, 2011 | By BD+C Staff

Modular Design Architecture >Dow Corning 758 sealant used in GreenZone modular high-performanc...

read more
Overlay Init