What is life cycle cost optioneering?

Life cycle cost optioneering is a way of assessing alternative design options, analyzing their long-term capital and operational costs to identify those with the lowest price tag, over the entire life cycle. 

December 09, 2013 |
Constructive Thinking Blog

Life cycle cost optioneering is a way of assessing alternative design options, analyzing their long-term capital and operational costs to identify those with the lowest price tag, over the entire life cycle. 

A key benefit of this technique is that it pinpoints the design features and solutions that consume less energy, produce less CO2 and consume less materials and water, in addition to program implications, operational impact, logistics, etc. This, in turn, helps decision makers clearly see the advantages of choosing green solutions and the options available, while providing sound financial evidence for supporting them. 

Life cycle cost optioneering is a combination of life cycle costing and life cycle assessment. Similar tools were used when the 32nd floor of the Empire State Building was retrofitted to meet high environmental standards throughout a 15-year lease.

Thinking in life cycles has made a big difference in our business. It means seeing a building, bridge, or road in terms of a cycle. Function, environmental consequences, and costs are spread over its lifetime, from construction and operation to final reuse when it has completed its service. 

More Posts from Skanska's Constructive Thinking blog

Skanska USA's Myrrh Caplan on green building trends

From Miami to D.C. and back again: The journey of a net-zero Solar Decathlon house

Skanska’s Beth Heider on LEED v4, and why it’ll keep us on history’s right side

Of course, planning for the entire life cycle requires a lot more work on the front end. Issues become more complex when you have to plan decades or even centuries ahead, and that can sometimes mean a departure from standard financial models. But the gains are that much greater. 

Lifecycle analysis means figuring in--from the very start--the environmental benefits that will save energy and reduce emissions throughout a structure’s lifetime. You can plan in flexibility to efficiently utilize a building even when new conditions arise later in its lifetime. It also means selecting materials and designs that can be easily recycled. 

Similarly, a lifecycle cost calculation includes not only figuring out what it will cost to build a hospital, for example, but what it will cost for its entire lifetime. Buildings and infrastructure that are planned, budgeted, and designed in this way might well be more expensive up front to build than those traditionally procured, but lower operating costs over the lifetime of the project can soon make it worth the investment.

 


About the author

Myrrh Caplan is the Skanska USA National Program Manager - Green Construction. More posts by Caplan.

Constructive Thinking Blog | Constructive Thinking Blog
Skanska

Skanska USA is one of the largest, most financially sound construction and development networks in the country, serving a broad range of industries including healthcare, education, sports, data centers, government, aviation, transportation, power, energy, water/wastewater and commercial. Skanska USA is committed to a set of core values which they call the Five Zeros: zero loss making projects, zero environmental incidents, zero accidents, zero ethical breaches and zero defects. Constructive Thinking is Skanska USA’s blog, where team members share their experiences and viewpoints on Skanska’s core values and explore trends in U.S. construction, development and infrastructure.

Related Blogs

A rendering of Skanska's 88 M Street NE project in Washington, D.C., one of three reference buildings profiled in a recent study by the New Buildings Institute, International Living Future Institute, and Skanska. Photo: courtesy Skanska

September 29, 2014 | Constructive Thinking Blog

Skanska USA's Steve Clem breaks down the costs and benefits of various ultra-green building standards and p...

Illustration: Skanska

September 07, 2014 | Constructive Thinking Blog

In this new partnership, LEED will benefit from the materials expertise of ACC and its member companies. We...

Illustration: Skanska

August 26, 2014 | Constructive Thinking Blog

In its latest blog post, Skanska shares tips and takeaways from the firm's second true integrated project d...

MetLife Stadium, home to 2014s Super Bowl, is one of the greenest sports venues in the U.S. Photo: Skanska USA

August 20, 2014 | Constructive Thinking Blog
The WELL Building Standard, a new protocol that focuses on human wellness within the built environment, i...

For Good Samaritan Hospital, Skanska and the project team created a single enhanced interface for facilities management, streamlining the day-to-day building management process.

January 12, 2014 | Constructive Thinking Blog

Improved space management, streamlined maintenance, and economical retrofits are among the ways building ow...

See the full infographic below. Source: Skanska USA

November 14, 2013 | Constructive Thinking Blog

In light of America's new energy resources and an increased emphasis on energy efficiency, Skanska examined...

Add new comment

Your Information
Your Comment

Filtered HTML

  • Web page addresses and e-mail addresses turn into links automatically.
  • Allowed HTML tags: <a> <em> <strong> <cite> <blockquote> <code> <ul> <ol> <li> <dl> <dt> <dd>
  • Lines and paragraphs break automatically.

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
Refresh Type the characters you see in this picture. Type the characters you see in the picture; if you can't read them, submit the form and a new image will be generated. Not case sensitive.  Switch to audio verification.
Overlay Init