flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

LEED EB:O&M can transform sustainability for the existing building stock

LEED EB:O&M can transform sustainability for the existing building stock


Dwight Perkins | September 4, 2012

While green standards for new and substantially renovated buildings garner widespread attention, a less spotlighted standard can impact the sustainability of many more structures. LEED for Existing Buildings: Operations & Maintenance (LEED EB:O&M) addresses building exterior and site maintenance programs, energy and water resources, purchase of environmentally preferred products and food, waste stream management, and indoor air quality.

LEED EB:O&M includes guidelines for whole building maintenance and cleaning, material use, and recycling programs, as well as system upgrades. Certification requires the project to meet prerequisites and earn a minimum of 34 points. Buildings must also score 69 points on the EPA’s Portfolio Manager Tool.

The building must meet the following requirements:

• The project must include at least one existing building in its entirety.

• The minimum floor area is 1,000 sf.

• The LEED project scope must include 100% of the floor area of each building in the application, with an exception for operations under separate management for up to 10% of floor area.

• Total gross floor area must be at least 2% of gross land area.

• The project must grant the USGBC and GBCI access to whole-building energy and water usage data for at least five years.

• Minimum occupancy rate: The buildings must be fully occupied for at least 12 months preceding certification application. Vacant tenant space of 25% of the floor area is permitted. For an apartment, hotel, dormitory, convention center, classroom, sports facility, or similar structure, ordinary partial occupancy is permitted.

• The performance period is at least three months for all credits and prerequisites, excluding energy performance, for which the minimum is 12 months.

(http://www.green-buildings.com/content/782523-leed-ebom-what-are-certification-requirements-existing-building)

boombox1 - default
boombox2 -
native1 -
halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â