flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

4 ways to wow community college clients

4 ways to wow community college clients


Rob Cassidy | February 21, 2013
The 46,000-sf Natural Sciences Building, Scottsdale (Ariz.) Community College, one of the Maricopa Community Colleges. Building Team: richrd+bauer (architect); Energy Systems Design (MEP); Paragon Design (SE); PK Kland Consulting Civil Engineers (CE); Research Facilities Design (lab planner); CF Shuler (landscape architect); Barton Malow Co. (CM at risk).

We've got a great March issue in the works ... here's a preview of our Cover Story, "How to Win More Work from Community Colleges," by Contributing Editor Peter Fabris.

1. HELP YOUR CLIENT FIND COST SAVINGS. “Treat our projects as if you were spending your own money,” says Arlen Solochek, AIA, District Director of Facilities Planning and Development, Maricopa Community Colleges. “We know what you are used to spending on private-sector jobs. A pet peeve I have is when contractors don’t hold down overhead costs: Do you really need that second work-site trailer?”

Sally Grans-Korsh, FAIA, LEED AP, former Director of Facilities Planning for the architect of the Minnesota state college system, recalls a renovation project where the contractor asked the college to change the curriculum so that the lab would not be needed for the next semester; this enabled the contractor to finish the job months sooner than planned. “He would have made more money with a longer construction schedule, but he realized it was not in the best interest of the college,” says Grans-Korsh, Principal Consultant/Owner of Minneapolis-based ArchiStudio. “We were impressed.”

2. MAINTAIN CLOSE COLLABORATION BETWEEN OWNER AND ARCHITECT, especially on design-build projects. Solochek says there’s a reason he seldom uses design-build project delivery: “I don’t want the contractor between me and the architect.” He recalls a project from bygone years. “We said the HVAC system plan wasn’t going to work, and the contractor went to the engineer and they insisted that it would work. Sure enough, it didn’t work, and we had a big fight over it.”

3. SHOW HOW YOU WOULD MANAGE PROCESSES In projects with multiple client partners. “Building Teams are going to have to demonstrate in their RFP responses and interviews how the would deal with multi-client projects––or how they have done so in the past––to give me confidence that they can manage these processes on my project,” says Solochek.

4. ADVOCATE FOR THE COLLEGE’S BEST OPTIONS when dealing with design planning committees. “Use your professional perspective to help enlighten people that have a more limited perspective,” says Grans-Korsh. “The worst examples are projects where the designers did exactly what the college officials said they wanted, even though that is not what the college needed.”

More from Author

Rob Cassidy | Oct 2, 2020

Everyone's getting a fire pit!

Skeleton fire pit in Chicago, October 2020

Rob Cassidy | Mar 30, 2020

Your turn: Has COVID-19 spelled the death knell for open-plan offices?

COVID-19 has designers worrying if open-plan offices are safe for workers.

Rob Cassidy | Mar 25, 2020

Coronavirus pandemic's impact on U.S. construction, notably the multifamily sector - 04-30-20 update

Coronavirus pandemic's impact on U.S. construction, notably the multifamily sector - 04-30-20 update

Rob Cassidy | Nov 20, 2019

Word of the Year: "climate emergency," says the Oxford English Dictionary

The Oxford Word of the Year 2019 is climate emergency.

Rob Cassidy | Nov 1, 2019

Do car-free downtown zones work? Oslo, yes; Chicago, no

Two recent reports (October 2019) explore whether car-free downtowns really work, based on experience in Oslo, Norway, and Chicago.

Rob Cassidy | Oct 9, 2019

Multifamily developers vs. Peloton: Round 2... Fight!

Readers and experts offer alternatives to Peloton bicycles for their apartment and condo projects.  

Rob Cassidy | Sep 4, 2019

Peloton to multifamily communities: Drop dead

Peloton will no longer sell its bikes to apartment communities.

boombox1 - default
boombox2 -
native1 -

More In Category




Reconsidering construction robotics

After decades when experts predicted that robots would become more prevalent on construction sites, it would appear that the industry has finally reached that point where necessity, aspiration, and investment are colliding. 

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021