FREE
Subscriptions:
Quick Links:
:: Print Edition
:: Digital Edition
:: eNewsletters
:: Reader Service
:: Webcasts
:: White Papers
:: Award Programs
:: Store

Site Search
Powered by Zibb

Sponsored By
Supplier Search

Site Sponsors

Directories
Office Furniture
Computer Desks
Canopies
Awnings
Cabanas
Easi-Set Industries
Fabric Structures
Tension Structures Furniture Store
Honeywell
Nora® Rubber Flooring
Office Chairs
Alcan
Flooring
NFBA
HP Workstations



Calgary's new water-friendly Water Centre flush with gold





The city of Calgary's new $43 million Water Centre office building, which houses the city's water services and water resources business units, is the first office project in Alberta to earn LEED Gold. This is the Canadian city's second first.

In 2004, Calgary was the first Canadian jurisdiction to adopt a sustainable building policy. For the past four years, Calgary has required all city-owned developments, including new construction and major renovation projects, to meet or exceed LEED Silver, as outlined by the Green Building Council of Canada.

The four-story, 183,000-sf Water Centre was penned by the Canadian architecture firms Manasc Isaac Architects (Edmonton) and Sturgess Architecture (Calgary). Their curving, flowing design evokes the shape of a wave, and their choice of blue and green glazing is fitting for a building serving the business of water.

In their bid for LEED Gold, the Water Centre designers zeroed in on water and energy conservation, which is expected to reduce the building's operational costs by 40%, compared to a standard commercial office facility. Highlights include:

  • 72% reduction in water waste and 59% reduction in water use, thanks to low-flow plumbing fixtures and fittings, a green roof, rainwater harvesting, and grey water landscaping irrigation.
  • 52% savings in annual energy consumption. A significant 95% of the facility is daylit. An underfloor ventilation system cuts energy use by 20%. Operable windows allow for natural ventilation.
  • 91% of construction waste was recycled.
  • Reclamation of a brownfield site.
  • Significant use of green building materials, including fly ash concrete, recycled steel, wood purchased under the Forestry Stewardship Council program, low-VOC products, and wheatboard millwork, shipped in from Saskatchewan.

The city of Calgary expects to operate the Water Centre virtually maintenance-free for the next 35 years, which must be another first for a government office building.


  

© 2009, Reed Business Information, a division of Reed Elsevier Inc. All Rights Reserved.




E-mail a friend Printer-friendly version



Talk Back

There are no comments posted for this article.

POST A COMMENT ON THIS ARTICLE




Advertorials

Staron Surfaces by Samsung
Unique surface offerings in Solid Surfaces, Quartz and its expanded Tempest line.

Marvin Windows and Doors
Substantial proportions, sturdy hinges, and different hardware options make the Marvin Commercial door a great choice for non-residential applications.
The Venting Picture Window from Marvin combines the beauty of a picture window with the opportunity for cross ventilation.

Dayton Superior
Concrete Accessories, Chemical Systems, Forming and Shoring, Masonry Accessories and Paving Systems.

Johns Manville Insulation
Turn Architecture Concepts into Physical 3D Models 5x-10x Faster. In-house.
Request Complimentary 3D Printing for Architecture Starter Kit

San Diego Gas & Electric Company
Take advantage of available incentives up to $2,000 per unit on green, energy-saving measures for qualifying new construction initiatives.