FREE
Subscriptions:
Quick Links:
:: Print Edition
:: Digital Edition
:: eNewsletters
:: Reader Service
:: Webcasts
:: White Papers
:: Award Programs
:: Store

Site Search
Powered by Zibb

Sponsored By
Supplier Search
Products/Services
Companies

Site Sponsors

Directories
Office Furniture
Computer Desks
Canopies
Awnings
Cabanas
Easi-Set Industries
Fabric Structures
Tension Structures Furniture Store
Honeywell
Nora® Rubber Flooring
Office Chairs
Alcan
Flooring
NFBA



Superfund site warehouse gets new life as a green visitors' center





A Cincinnati-based team of Megen Construction Co. and Glaserworks Architecture is turning what was once a warehouse on a former Superfund cleanup site into a green visitors' center for the new Fernald Preserve, 18 miles northwest of Cincinnati. The 1,050-acre site was home to a uranium processing facility that supported the U.S. weapons program from 1952 until 1989. A $4.4 billion environmental cleanup project converted the site into a nature preserve now operated by the U.S. Department of Energy's Office of Legacy Management.

The 10,800-sf, $3 million adaptive-reuse project broke ground in December. Designed to achieve LEED Gold certification, the visitors' center will feature occupancy sensors, dual-flush toilets, low-flow plumbing fixtures, low-VOC finishes, a bio-wetland on the site that will process all the building's wastewater, and a geothermal heating and cooling system that will reduce energy consumption by 48% based on current utility costs.

The visitors' center is scheduled to open in summer 2008.


  

© 2008, Reed Business Information, a division of Reed Elsevier Inc. All Rights Reserved.




E-mail a friend Printer-friendly version



Talk Back

There are no comments posted for this article.

POST A COMMENT ON THIS ARTICLE