FREE
Subscriptions:
Quick Links:
:: Print Edition
:: Digital Edition
:: eNewsletters
:: Reader Service
:: Webcasts
:: White Papers
:: Award Programs
:: Store

Site Search
Powered by Zibb

Sponsored By
Supplier Search
Products/Services
Companies

Site Sponsors

Directories
Office Furniture
Computer Desks
Canopies
Awnings
Cabanas
Easi-Set Industries
Fabric Structures
Tension Structures Furniture Store
Honeywell
Nora® Rubber Flooring
Office Chairs
Alcan
Flooring
NFBA
HP Workstations



Power Play


An abandoned coal-fired generating plant in Chester, Pa., is converted into a state-of-the-art office and data center.




From its opening in 1918 to well into the 1980s, the 400,000-sf Chester Waterside Station churned out electric power for industries and homes in and around Chester, Pa.

By the turn of the millennium, though, the coal-fired turbines inside the massive structure had been still for 20 years. In the surrounding neighborhood, one in four families lived below the poverty line, and the city's murder rate was twice the national average, according to the FBI. Despite the inherent beauty of its site along the Delaware River, it was hard to imagine any future for the once elegant City Beautiful structure.

But no such lack of vision afflicted Michael O'Neill, CEO of Preferred Real Estate Investment Inc., Conshohocken, Pa., who happened to drive by the site one day and saw opportunity where others saw only defeat. "Every study concluded that there was no possible economic reuse for it," O'Neill said. "But it was so monumental and so beautiful on its riverfront setting that I felt it would be a crime to have it destroyed."

In late 2000, O'Neill purchased the building and 90 acres of riverfront land for $1, renamed it "The Wharf at Rivertown," and hired Blackney Hayes Architects, Philadelphia, to renovate the shell for office use.

Fortunately, the building was in remarkable condition, according to Jody Arena, project manager for A&E Construction of Upper Darby, Pa. "There was some asbestos and lead paint that had to be removed, but apart from that there was just the standard power washing," Arena said. "We leveled the floor in areas and removed the turbines. We also refurbished a lot of the 100-year-old brass fixtures."

The property was located within a Keystone Opportunity Zone designated by the state's Department of Environmental Protection. Within such zones, state and local taxes are waived for 15 years, thus vastly improving the project's financial feasibility.

By 2001, O'Neill had found his anchor tenant, Synygy, the country's largest provider of web-based software for managing employee performance, which agreed to move 300 employees from its base in Conshohocken. To fit out its new headquarters space, Synygy brought in an architectural team from Hillier, Inc., of Princeton, N.J.

The task before Hillier senior associate Sonja Bijelic was hardly trivial—to create a high-tech 21st-century office environment within a structure that was more 19th-century than 20th. Federal tax credits were being used in the project, so Bijelic couldn't touch the building's envelope. The solution: build structures within the massive space using transparent and translucent materials that would blend into the background.

Rather than fill the main Turbine Hall—an area the size of a football field—with cubicles, Bijelic designed two stand-alone structures with enclosed spaces for offices and computer servers. These "architectural insertions" used glass and semitransparent polycarbonate sheeting, along with ordinary drywall in places for a solid background. These would be topped by wide-open reception areas that together could accommodate as many as 800 for company events.

Heating and cooling these open areas was not easy, because it was impossible to provide mechanical service from above the so-called architectural insertions. "The HVAC for the mezzanine space took our team two months to design," Bijelic said. "We decided to cool only the first eight to 10 feet above the mezzanine, and opted for a 12-inch raised floor with pressurized air vents. For cooling, this is the best possible solution, less so for heating."

Bilejic admits that the acoustics were not optimal. "At first, there was a seven-second echo inside the turbine hall," said Bilejic. "We used acoustic materials on the walls and opted for carpet tiles that were large in scale—100-by-100 cm—because of the enormity of the space."

For the contractor, the enormous space posed other difficulties. "Dealing with the 85-foot-high ceiling and hanging lighting was a challenge, but the building helped us out with that problem," Arena said. "There is an existing overhead crane system that slid on rails, and we erected scaffolding on the crane, using it to hang the lighting. The crane is not intended to be used again, so we worked from one end of the building to the other, parking it when we were done."

Late in the project, the contractor had to struggle to get materials inside the building. "After the owner put in the new window systems, we found we could not get large materials in," Arena said. "For the Synygy buildout, we needed to hoist everything through a 42-inch-wide door in a stair tower 20 feet in the air."

"Not only is the elegant space preserved, but the quality of the new design elements is very high," said judge Walker Johnson, FAIA, principal with Johnson Lasky Architects, Chicago.

In the end, O'Neill's vision paid off. Besides Synygy, five other tenants, including Wells Fargo Financial Acceptance, have leased space in the building.

 

Project Summary

Chester, Pa.

Building Team

Submitting firm: Hillier Architecture (architect for Synygy)

Architect (shell): Blackney Hayes Architects

Owner: The Buccini/Pollin Group

Developer: Preferred Real Estate Investment, Inc.

Structural engineer: CVM Engineers

Mechanical engineers: Devine Brothers, Syska Hennessy Group (data center)

Electrical engineers: Robert Ford Electric, Syska Hennessy Group (turbine hall)

General contractor/construction manager: A&E Construction Co.

General Information

Size: 396,000 gross sf

Levels: 5

Construction time: October 2004 to June 2005


  

© 2008, Reed Business Information, a division of Reed Elsevier Inc. All Rights Reserved.




E-mail a friend Printer-friendly version



Talk Back

There are no comments posted for this article.

POST A COMMENT ON THIS ARTICLE




Advertorials

Staron Surfaces by Samsung
Unique surface offerings in Solid Surfaces, Quartz and its expanded Tempest line.

Marvin Windows and Doors
Substantial proportions, sturdy hinges, and different hardware options make the Marvin Commercial door a great choice for non-residential applications.
The Venting Picture Window from Marvin combines the beauty of a picture window with the opportunity for cross ventilation.

Dayton Superior
Concrete Accessories, Chemical Systems, Forming and Shoring, Masonry Accessories and Paving Systems.

Johns Manville Insulation
Turn Architecture Concepts into Physical 3D Models 5x-10x Faster. In-house.
Request Complimentary 3D Printing for Architecture Starter Kit

San Diego Gas & Electric Company
Take advantage of available incentives up to $2,000 per unit on green, energy-saving measures for qualifying new construction initiatives.