FREE
Subscriptions:
Quick Links:
:: Print Edition
:: Digital Edition
:: eNewsletters
:: Reader Service
:: Webcasts
:: White Papers
:: Award Programs
:: Store

Site Search
Powered by Zibb

Sponsored By
Supplier Search
Products/Services
Companies

Site Sponsors

Directories
Office Furniture
Computer Desks
Canopies
Awnings
Cabanas
Easi-Set Industries
Fabric Structures
Tension Structures Furniture Store
Honeywell
Nora® Rubber Flooring
Office Chairs
Alcan
Flooring
NFBA
HP Workstations



High School Project Gets the OK—45 Years Later





After 45 years of quibbling over the ideal location for its new high school, town leaders in Everett, Mass., have finally agreed on a site for the Everett High School. The $64 million facility, which broke ground in May, will be constructed on a hilly, five-acre site. HMFH Architects, Cambridge, Mass., adapted the design to the sloped site, placing the front entrance on the first floor and the rear entrance on the fourth floor. The project also includes athletic facilities, a library/media center, a 1,200-seat auditorium, and a health center for students and families to be operated by the local hospital. General contractor Suffolk Construction and construction manager R.F. Walsh Co., both based in Boston, plan to complete the school in fall of 2007.


  

© 2008, Reed Business Information, a division of Reed Elsevier Inc. All Rights Reserved.




E-mail a friend Printer-friendly version



Talk Back

There are no comments posted for this article.

POST A COMMENT ON THIS ARTICLE