FREE
Subscriptions:
Quick Links:
:: Print Edition
:: Digital Edition
:: eNewsletters
:: Reader Service
:: Webcasts
:: White Papers
:: Award Programs
:: Store

Site Search
Powered by Zibb

Sponsored By
Supplier Search
Products/Services
Companies

Site Sponsors

Directories
Office Furniture
Computer Desks
Canopies
Awnings
Cabanas
Easi-Set Industries
Fabric Structures
Tension Structures Furniture Store
Honeywell
Nora® Rubber Flooring
Office Chairs
Alcan
Flooring
NFBA



Contractors plan for a mixed outlook in 2002





From the contractor's perspective, the construction outlook for 2002 is mixed, with the expected timing and strength of economic recovery varying by region and industry segment. According to Ken Simonson, chief economist for the Washington, D.C.-based Associated General Contractors of America, while airline traveler-dependent hotels continue to suffer, destinations within driving distance of large populations, such as New England and Mid-Atlantic coastal and mountain resorts, are seeing an upturn that will lead to selective additional construction.

The industrial sector will decline, but import warehouse facilities may show growth as businesses expand facilities to ensure the availability of just-in-time parts and supplies, Simonson says.

Many construction executives foresaw the economic slowdown and have been preparing for a softening market, says Michael J. Meagher, vice president of marketing for James McHugh Construction Co., Chicago. In the Chicago area, for instance, Meagher says contractors had already begun adapting to the reality that private-sector work was tapering off. "Savvy contractors will place a new emphasis on public-sector projects, renovation and renewing their commitments to existing clients in a buyers' market," he adds.

Simonson and Meagher expect most cost increases to ease and labor shortages to subside. However, rapidly rising insurance and bond premiums continue to be an industry issue.

Cost comparisons per square foot in select metro markets
Parking garageUnderground parkingTown hallCommunity center
'02'01% chg.'02'01% chg.'02'01% chg.'02'01% chg.
Atlanta28.4027.403.744.0842.284.392.7489.813.389.2086.613.0
Baltimore29.0128.262.645.0243.613.294.7092.642.291.0989.332.0
Boston36.4635.363.156.5854.573.7119.03116.951.8114.48111.782.4
Chicago35.5034.263.655.1052.864.2115.92112.293.2111.50108.283.0
Cleveland32.5631.642.950.5348.833.5106.29103.722.5102.24100.022.2
Dallas27.0126.143.341.9240.333.988.1886.981.484.8282.762.5
Denver30.2129.273.246.8945.173.898.6495.962.894.8792.532.5
Detroit33.7632.663.452.4050.394.0110.23107.053.0106.02103.232.7
Houston27.9926.973.843.4441.614.491.3989.572.087.9085.243.1
Kansas City31.9230.753.849.5447.454.4104.22100.803.4100.2597.203.1
Los Angeles34.3333.362.953.2851.483.5112.09110.031.9107.81105.462.2
Miami26.9826.481.941.8740.852.588.0886.791.584.7283.691.2
Minneapolis34.5234.320.653.5852.951.2112.71112.490.2108.51108.480.0
New Orleans27.1026.352.842.0740.663.488.4986.392.485.1283.302.2
New York City42.6741.363.266.2263.823.8139.31135.582.8133.99130.732.5
Philadelphia35.2534.262.954.7152.863.5115.09112.292.5110.70108.282.2
Phoenix28.3427.463.243.9842.373.892.5390.012.889.0086.802.5
Pittsburgh32.2431.183.450.0448.114.0105.26102.802.4101.2498.562.7
Portland33.5432.812.252.0550.632.8109.50107.551.8105.32103.711.6
St. Louis32.6531.732.950.6848.973.5106.61104.032.5102.54100.312.2
San Diego33.5432.692.652.0550.443.2109.50107.152.2105.32103.321.9
San Francisco39.4337.704.661.2058.175.2128.75124.293.6123.84119.173.9
Seattle33.4132.104.151.8649.544.7109.09105.623.3104.93101.483.4
Washington, D.C.29.9629.152.846.4944.983.497.8196.081.894.0792.152.1
Winston/Salem23.9023.342.437.1036.013.078.0477.131.275.0673.771.7
NOTE: Costs are for the basic building and do not include sitework, land, development, specialty finishes or equipment. Square foot costs vary significantly from project to project because of quality, complexity and economic climate. For a detailed list of building components included in these figures, see Means Square Foot Costs.
R.S. Means Co., P.O. Box 800, Kingston, MA 02364, (781) 585-7880, (800) 448-8182
For more data, visit R.S. Means on the Web at www.rsmeans.com. To use an interactive tool that helps estimate costs, visit www.buildingteam.com.


  

© 2008, Reed Business Information, a division of Reed Elsevier Inc. All Rights Reserved.




E-mail a friend Printer-friendly version



Talk Back

There are no comments posted for this article.

POST A COMMENT ON THIS ARTICLE