FREE
Subscriptions:
Quick Links:
:: Print Edition
:: Digital Edition
:: eNewsletters
:: Reader Service
:: Webcasts
:: White Papers
:: Award Programs
:: Store

Site Search
Powered by Zibb

Sponsored By
Supplier Search
Products/Services
Companies

Site Sponsors

Directories
Office Furniture
Computer Desks
Canopies
Awnings
Cabanas
Easi-Set Industries
Fabric Structures
Tension Structures Furniture Store
Honeywell
Nora® Rubber Flooring
Office Chairs
Alcan
Flooring
NFBA
HP Workstations



Promise fulfilled


Originally planned as a hotel in 1906, the Fulton Building in Pittsburgh fulfills its original promise




When seen initially on a rainy January day by its eventual owner and developer, the Fulton Building, a 95-year-old office building in downtown Pittsburgh, was surrounded by blight. But 41 months later, the redeveloped historic landmark became the latest jewel in the Marriott Renaissance Hotel chain with strong customer acceptance. The 14-story former office building is located in the heart of the city's revived cultural district and across the Allegheny River from the baseball Pirates' new PNC Park and the football Steelers' new Heinz Field (see "Sports projects on the dole," March 2001, page 10).

In short, Denver-based Sage Hospitality Resources, the building's owner, developer and manager, is thrilled with its investment. "It's the finest hotel we've developed to date. I could sit in the lobby for hours and admire it," says Kenneth Geist, Sage executive vice president. "It should be highly successful if the last several months are any indication."

According to Michael Coolidge, Sage's vice president of development and project manager, the hotel has received high marks for guest satisfaction and complimentary reviews.

"All the historical aspects of the building were restored in spectacular fashion," says Coolidge. "One of the reasons we chose the building was its uniqueness, from the lobby's marble and glazed dome to the exterior courtyard's copper cladding. In some ways, it came out even better than anticipated."

Preserve and protect

The successful outcome did not come easily, however. General contractor Hensel Phelps Construction Co. of Greeley, Colo., worked to accomplish the wants of the owner/developer in renovating the dilapidated office building, whose main tenant was a popular dance club, with requirements set forth by the U.S. Department of the Interior guidelines for historic renovation. Preservation of numerous elements of the building was necessary for placement of the building on the National Register of Historic Places, and to ensure that the developer would recoup $7 million in federal tax credits for preserving the building. According to Coolidge, the tax credits made redevelopment of the venerable building economically feasible (see "Building on tradition," page 23).

Consultants and subcontractors were coordinated to ensure that the $50 million redevelopment was completed in time for the start of the 2001 baseball season. Simultaneous reconstruction of Fort Duquesne Boulevard, on which the hotel fronts, and of a parking garage across Sixth Street from the building severely limited access to the building. Because the building had no loading dock, materials and equipment had to be brought in through the front entrance.

To foster coordination, Hensel Phelps; the owner's representative, Celli Flynn Brennan Architects and Planners of Pittsburgh; and the architecture firm JG Johnson Architects Inc. of Denver met frequently with consultants and subcontractors to plan design and construction before and during the building phase.

The 231,600-sq.-ft. building was an ideal candidate for redevelopment into a hotel because it originally was designed to be a hotel, but never became one until this renovation. "We don't like to buy old hotels," says Geist, "because old plumbing and electrical come with them. This way you get an historic hotel that also looks and feels like a new boutique."

Design hinges on M/E/P needs

While the building's double-loaded corridors system lent themselves to a hotel, its age and condition required replacement of all the mechanical, electrical and plumbing (M/E/P) systems. Significant upgrades to fire/life-safety systems were also necessary to bring the building into code compliance.

"The M/E/P and fire protection were integral parts of the renovation process," says William Thumm, project engineer for Hensel Phelps. "Where the lines are run through the building affects its design and renovation."

With M/E/P playing a critical role, Pittsburgh-based M/E/P companies Sauer Inc. and Dodson Engineering Inc. teamed to perform the work as specialty design/build. "There was a lot of coordination between the M/E/P design/builders and the interior designer (Wilson & Associates of Dallas) and architect," says Celli Flynn Brennan's project manager, William Brennan.

Thumm also credits the work of the owner's M/E/P consultant, Thomas Gilbertson of Thomas A. Gilbertson & Associates of Moraga, Calif., saying, "It's rare, but the building's maintenance manager actually likes his system."

The M/E/P system consists of two 300-ton central chillers in the basement. The units are water-cooled and connected to two induced-draft cooling towers on the roof, according to David Casciani, Sauer's vice president and division manager, northeast division. The M/E/P infrastructure was installed through the shaft of a decommissioned elevator.

The heating source is provided by a central-steam distribution system in Pittsburgh. The steam produces hot water, which is transported through a modified four-pipe fan-coil system that supplies heating and cooling for rooms.

Two rooftop heat-recovery units exhaust the bathrooms and supply tempered outside air to the building. A central air-handler services the restaurant, meeting rooms and public areas.

The building is controlled by direct-digital-control and temperature-control systems.

Renovation of high-end materials

The hallmark of the building's interior is its lobby, which is covered in marble and features a mosaic tile ceiling. Years of neglect and the lobby's recent use as a dance club and cigar bar resulted in significant damage and nicotine buildup, which required repair and cleaning by Columbia Marble Co. of Pittsburgh.

A large, glazed, cast-iron, compression-ring dome above the lobby also was restored.

Extensive cleaning and restoration was conducted on the building exterior's pink granite. But the most striking exterior restoration involved the building's copper-clad exterior that covers the U-shaped building's interior courtyard. The 28,000-sq.-ft. restoration is said to be the largest in the United States since the Statue of Liberty. "We saw the copper cladding as one of the stronger assets of the building," says Brad Bull, the architect's project manager. A performance specification was written for the cleaning and restoration, which was conducted by Ralph J. Meyer Co. of Pittsburgh. A dry soda blast was used to clean the copper.

Ralph J. Meyer also performed the replacement of the entire terra-cotta roof (see "A repeat role for terra-cotta tile roof," below).

Windows were restored where possible or replaced by Window Systems Inc. of Pittsburgh, according to the requirements of the Interior Department guidelines (see "Window restorations help preserve yet modernize historic buildings," July 2001, page 106).

Nearly a century after being built, the Fulton Building and Pittsburgh are in the midst of an economic renaissance. Ironically, the Fulton's reincarnation as the Renaissance Hotel makes a significant contribution to this revival, an example in structural steel of the city's proud past and promising future.

Construction Costs
Preconstruction services$78,270
Warranty allowance10,563
General conditions1,379,497
Demolition/abatement1,748,285
Concrete/concrete reinforcement572,730
Labor for MBEs813,296
Interior stone restoration/masonry910,831
Structural/ornamental metals1,066,371
Finish carpentry1,112,120
Built up/tile/copper roofing1,201,207
Copper cleaning133,672
Dome restoration/miscellaneous glass121,863
Doors/hardware844,880
Aluminum storefront/glazing218,808
Exterior punched windows792,599
Floor-medallion restoration47,066
Gypsum board/acoustical ceiling3,334,677
Ceramic/quarry tile770,218
Painting/vinyl-wall covering install509,925
Elevators/maintenance956,689
M/E/P6,704,539
Fire protection/fire pump431,271
Electrical3,628,440
Miscellaneous costs1,305,397
TOTAL$28,693,212

 

PROJECT SUMMARY

Fulton Building

Pittsburgh

Building team

Owner/developer: Sage Hospitality Resources

Architect: JG Johnson Architects P.C.

Interior designer: Wilson & Associates

Historical architect: Bureau for Historic Preservation

Structural engineer: Atlantic Engineering

Mechanical/electrical/plumbing design/build: Sauer Inc.; Dodson Engineering Inc.

General contractor: Hensel Phelps Construction Co.

General information

Area: 240,188 gross square feet

Number of floors: 14

Construction time: October 1999 to March 2001

Construction cost: $28.69 million

Delivery method: Design/bid/build; M/E/P design/build

A repeat role for terra-cotta tile roof

The Fulton Building's deteriorated roof required complete removal and replacement. Pittsburgh-based Ralph J. Meyer Co. performed the replacement of the terra-cotta tile roof as well as the restoration of the exterior courtyard's copper cladding and cornices. Meyer's dual role proved beneficial in coordination of the copper restoration and the roof replacement.

The new roof was built using the same roof profile manufactured by the original manufacturer, Ludovici Tile of Pittsburgh, which constructed the original roof 95 years earlier. Although other materials were considered, terra-cotta tiles were again selected because the material's life expectancy showed it to be the most cost competitive.

"We haven't seen terra-cotta used on roofs in this area. This is the first I've seen," says John Schneider, vice president of Atlantic Engineering of Pittsburgh, the project's structural engineer. The use of terra-cotta for the replacement required Robert Bertocchi, Atlantic's structural designer on the project, to develop a method of securely fastening the tile to the structure.

Other construction forced the team to cantilever off the 14th floor of the building.


  

© 2008, Reed Business Information, a division of Reed Elsevier Inc. All Rights Reserved.




E-mail a friend Printer-friendly version






Advertorials

Staron Surfaces by Samsung
Unique surface offerings in Solid Surfaces, Quartz and its expanded Tempest line.

Marvin Windows and Doors
Substantial proportions, sturdy hinges, and different hardware options make the Marvin Commercial door a great choice for non-residential applications.
The Venting Picture Window from Marvin combines the beauty of a picture window with the opportunity for cross ventilation.

Dayton Superior
Concrete Accessories, Chemical Systems, Forming and Shoring, Masonry Accessories and Paving Systems.

Johns Manville Insulation
Turn Architecture Concepts into Physical 3D Models 5x-10x Faster. In-house.
Request Complimentary 3D Printing for Architecture Starter Kit

San Diego Gas & Electric Company
Take advantage of available incentives up to $2,000 per unit on green, energy-saving measures for qualifying new construction initiatives.