Education Facility

July 22, 2013 | BD+C Staff

Cannon, Perkins+Will, Stantec top Building Design+Construction's 2013 ranking of the largest univ...

read more
July 19, 2013 | BD+C Staff

Structure Tone, DPR, Gilbane top Building Design+Construction's 2013 ranking of the largest recon...

read more
July 19, 2013 | BD+C Staff

URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reco...

read more
July 19, 2013 | BD+C Staff

Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction a...

read more
The Paramount Theatre of Cedar Rapids, Iowa, was heavily damaged by flooding in

The Paramount Theatre of Cedar Rapids, Iowa, was heavily damaged by flooding in 2008, with water inundating underground levels and rising nearly eight feet on the main floor. A team including KJWW Engineering Consultants and Ryan Companies revived the 1928 venue in 2012, incorporating modern amenities for performers and audiences. PHOTO: MAINSTREET STUDIO

July 19, 2013 | Julie Higginbotham, Senior Editor
Increasingly, owners recognize that existing buildings represent a considerable resource in emb...
read more
July 19, 2013 | BD+C Staff

The Brick Industry Association named the winners of its 2013 Brick in Architecture Awards. Here a...

read more
July 11, 2013 | BD+C Staff

An amendment to a Michigan appropriations budget authorizes an increase in state debt to pay for...

read more
July 02, 2013 | USGBC

The U.S. Green Building Council membership has voted to adopt LEED v4, the next update to the wor...

read more

Wikipedia

July 01, 2013 | BD+C Staff

A new report released today forecasts the volume of construction output will grow by more than 70...

read more
June 28, 2013 | BD+C Staff

A recent survey of more than 60 building owners and facility management professionals by Mortenso...

read more
June 17, 2013 | BD+C Staff

The Energy Department today launched a new Buildings Performance Database, the largest free, publ...

read more
June 13, 2013 | BD+C Staff

More than 90% of New York City schools have at least one outstanding building code violation. Loo...

read more
The Georgia Tech Carbon-Neutral Energy Solutions Laboratory was the lone Platinu

The Georgia Tech Carbon-Neutral Energy Solutions Laboratory was the lone Platinum Award winner in the 2013 Building Team Awards competition.

June 12, 2013 | BD+C Editors

The winners of the 2013 Building Team Awards show that great buildings cannot be built without th...

read more
The tower at the Vernon S. Broyles Leadership Center unifies a new addition (lef

The tower at the Vernon S. Broyles Leadership Center unifies a new addition (left) with the rehabilitated Simons-Law building (right). The glass tower, which was built to support a future carillon, features brick piers that reinforce the projects neoGothic style.

June 12, 2013 | Raissa Rocha, Associate Editor

A renovation/addition project at Columbia Theological Seminary unites a historic residence hall w...

read more
Vertical elements and orange brick on the Old Town Schools new East Building ev

Vertical elements and orange brick on the Old Town Schools new East Building evoke the faade of the clients headquarters across the street, which was created through adaptive reuse of an Art Deco library. Precast concrete panels interpret the word music in ancient and modern languages.

June 12, 2013 | Julie S. Higginbotham, Senior Editor

A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustic...

read more
The Wabash Building (blue) is a modern response to Roosevelt Universitys needs

The Wabash Building (blue) is a modern response to Roosevelt Universitys needs that also preserves the schools connection to the historic Auditorium Building (foreground). This view looking northeast shows the proximity of rapid transit, with Lake Michigan in the background.

June 12, 2013 | Julie Higginbotham, Senior Editor

Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction,...

read more
Georgia Techs Carbon-Neutral Energy Solutions Laboratory was built on a compact

Georgia Techs Carbon-Neutral Energy Solutions Laboratory was built on a compacted site adjacent to a rail line. Water conservation goals required installation of permeable paving and a bioretention basin, as well as a rainwater cistern that supplies nonpotable systems in the building.

June 12, 2013 | Julie Higginbotham, Senior Editor

Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for ene...

read more
June 07, 2013 | BD+C Editors

The University of Utah broke ground on its cutting-edge College of Law building, which will facil...

read more
June 05, 2013 | USGBC

In an effort to accelerate sustainable development around the world, the U.S. Green Building Coun...

read more
June 03, 2013 | U.S. Census Bureau

The U.S. Census Bureau of the Department of Commerce announced today that construction spending d...

read more
Sky City, Changsha. Rendering courtesy of Broad Sustainable Building

Sky City, Changsha. Rendering courtesy of Broad Sustainable Building

May 23, 2013 | BD+C Staff
May 17, 2013 | BD+C Staff

The 70-page guide demystifies the processes of identifying building improvement opportunities and...

read more

The west lobby of Marquez Hall, at the Colorado School of Mines, features a 27-foot-tall glass curtain wall and dramatic cantilevered entrance canopy. Shown here before fitout was complete, the lobby houses exhibits that bring petroleum engineering into sharper focus for school groups and other visitors.

May 14, 2013 | Julie Higginbotham, Senior Editor

Increasingly, college and university research buildings are doing double duty as homes for K-12 S...

read more
May 08, 2013 | C.C. Sullivan and Barbara Horwitz-Bennett

When embarking upon a roofing renovation project, one of the first decisions for the Building Tea...

read more
May 01, 2013 | AIA

More than 350 companies urge rejection of special interest efforts to gut key parts of Energy Ind...

read more
For a recent renovation of a stairwell and exit corridors at Ridgewood High Scho

For a recent renovation of a stairwell and exit corridors at Ridgewood High School in Norridge, Ill., the design team specified

April 30, 2013 | BD+C Staff

Kate Steel of Steel Consulting Services offers tips and advice for choosing the correct code-comp...

read more
 Michael Green Architecture

Michael Green Architecture

April 30, 2013 | DesignBoom
April 26, 2013 | DLR Group

DLR Group and the Institute for the Built Environment at Colorado State University have collabora...

read more
April 24, 2013 | BD+C Staff

North Carolina lawmakers have introduced state legislation that would restrict the use of nationa...

read more
April 24, 2013 | BD+C Staff

Los Angeles Mayor Antonio Villaraigosa wants cool roofs added to the city’s building code. He is...

read more
Overlay Init