8 tips for converting office space to life sciences labs

Laboratories

8 tips for converting office space to life sciences labs

Creating a successful life sciences facility within the shell of a former office building can be much like that old “square peg round hole” paradigm. Two experts offer important advice.


By Leonora Georgeoglou, NCIDQ, LEED AP ID+C, and Dan Ringler, CID, HED | March 10, 2021
8 tips for converting office space to life sciences labs BioMarin_Novato

BioMarin develops innovative biopharmaceuticals for serious diseases and medical conditions, focusing on those that address unmet medical needs. The HED design team has completed multiple laboratory renovations and expansions for the company’s commercial and clinical manufacturing facilities, including this facility in Novato, California. Photo: HED

    

Since the onset of the coronavirus pandemic, real estate markets have clearly taken major pivots across the board. From residential adjustments toward the suburbs, the incorporation of safety barriers in public facilities, to major changes in commercial retail and restaurant consumer demands, those of us working in the built environment are seeing trends shift at a pace faster than ever before. 

One of the largest trends that is changing the face of real estate is the country’s increasing demand for life sciences and laboratory space. A recent article from Bloomberg noted this increased demand for lab space, pointing to “billions of dollars in institutional investment” that signals a huge shift in how we provide life science space and where.

The demand for life science buildings was increasing before the pandemic thanks to a new generation of Americans with a heightened awareness of health and wellness and the increasing commercialization of University-level science research. The pandemic only accelerated this demand. 

The opportunity to absorb this new lab space demand has fallen into the lap of office building owners. With much of the nation still working from home, we have all grown very comfortable with the possibility of the long-term reduction of traditional office space. As a result, this rise in lab demand has a potentially significant intersection with the timing of office vacancies.
 

laboratory at the Wayne State University Biosciences Center, designed by HED

This laboratory at the Wayne State University Biosciences Center, designed by HED, features modular lab units, which can easily be plugged into various positions and swapped out depending on evolving science and research needs. Photo: HED

 

However, the insertion of life science and laboratory space into traditional office buildings is a bit more complicated than that sort of one-for-one, office-to-office, programmatic replacement. Creating a successful life sciences facility within the shell of a former office building can be much like that old “square peg round hole” paradigm. 

So as architects and workplace and laboratory planners with long histories of work with both building types, we wanted to offer some critical, preliminary guidance for building owners and developers to consider when approaching this transition.

 

8 tips for converting office buildings to life sciences laboratory spaces  

 

1. BUILDING INFRASTRUCTURE

Life science tenants typically need increased primary electrical service, backup generation, and increased water supply infrastructure. So, owners will need to assess what the existing power, water, and sewer line infrastructure supports. Does the existing building currently have fire sprinklers? Does an emergency generator already exist on site? These are critical questions to be answered. 

Electrical service should be provided around 25-29 watts per square foot. Whereas office design for power may be around 12-14 watts per square foot. Electrical outlets are also often ceiling-mounted within lab spaces for plug-and-play lab modules, so the wiring infrastructure should support that shift. 

Water and sewer services will also need to be increased. Sewer services will likely need to be improved upon because of substances utilized in lab facilities and the chemical safety requirements associated with those. Many older or industrial-oriented spaces are often not sprinklered and, in most cases, they will be required for life sciences activities. 

An emergency backup generator is almost always required for life sciences users, whereas in the office sector, generators are typically only found in financial office spaces. If one does not exist on site, a location and size should be determined, and this may require additional structural enhancements. 

 

2. FLOOR-TO-FLOOR HEIGHT

In a laboratory space, duct lines, plumbing lines, and wiring all need to be safely tucked behind dropped ceilings to ensure the sterile nature of the environment and to reduce the potential for spark or dust interactions. This is one of the many reasons why a 16-to-17-foot floor to floor height is ideal for life sciences facilities. This allows enough height for the floor structure and 3 feet of space for HVAC and a dropped ceiling. 

There are ways to make an existing low floor-to-floor height work, but most office buildings simply will not have the preferred clearance. However, not impossible, the strategies for designing a life science facility with existing low ceilings can be expensive. So, this issue should be assessed up front and carefully. 

 

3. SPACE PLANNING

What is the existing building’s center-to-center column spacing? Many laboratory bays are designed on an eleven-foot module. Therefore, column spacing that is 22 feet, 33 feet, or 44 feet would be ideal for this conversion—though successful operation is not impossible at other column spacing configurations. This planning arrangement will provide great efficiency for your new user layout, especially for growing life sciences companies looking for modular lease options.

 

4. ROOF CONDITION AND CAPACITY

What is the condition and construction of the existing roof? Not only can your roof play an important role in the air tightness of your building envelope, but your roof structure is also typically home to your HVAC systems. If HVAC systems need to be added for your new life sciences users, this might mean additional HVAC systems may be located on the roof. Therefore, your roof’s structural capacity will need to be considered. While many roofs are built with additional capacity incorporated into their design, not all are. Structural, in most cases, can reinforce a roof to handle additional required HVAC loads, but owners should also be aware of city zoning and overlays that might enforce height limitations as these rooftop decisions are being made. 

 

5. INSULATION

How well is the building currently insulated? In addition to its important role in temperature control in sensitive laboratory testing, window and wall insulation is also often regulated for the safety of life science spaces. Exterior walls and the roof structure will need to be insulated. If you are considering exterior renovations, the addition of dual-pane glazing might be a major cost to consider. 

 

6. SHIPPING & LOADING ZONES

Unlike in typical office uses, shipping and receiving can be important aspects of laboratory and life science operations. From packaging and distribution of new product to the receipt of lab supplies, a loading dock can be an important criterion for a successful laboratory operation. If considering a multi-tenant building occupancy, careful planning of this loading zone will be even more necessary. 

 

7. OVERALL STRUCTURAL CAPACITY

What is the current floor condition and construction quality? Some life science tenants have considerable equipment loads while others have stringent vibration isolation requirements. Live loads in the neighborhood of 125-150 pounds per square foot will be ideal for laboratory facilities. This is a bit higher than typical office buildings, so builder owners should look into this factor, and its capacity for potential increase in certain zones, early. 

 

8. MECHANICAL COMPLEXITY

The mechanical systems provided within a standard office building are fairly well-known and focused on occupant comfort. Mechanical systems for laboratory spaces are dramatically more complex and might include air vacuum systems, reverse osmosis skids, liquid nitrogen lines, and bulk liquid provision. These all require increased exhaust openings, power access, and lines running throughout the building walls and ceilings. Therefore, the ideal office buildings for life science uses will have significant interior wall and ceiling access points and overall capacity. 

 

These eight areas for consideration are just the beginning of a careful conversion process. We hope that this tool will help as you conduct a quick, preliminary analysis of your existing facility before beginning an appropriate unique, site-specific study for the reuse of your existing office building. With more than 23 million square feet of laboratory design under our belts, these insights should certainly help as you work to cut to the feasibility chase. 

 

ABOUT THE AUTHORS
Leonora Georgeoglou, NCIDQ, LEED AP ID+C
| As a design leader with HED, Leonora has a passion for integrating interiors with architecture, utilizing evidence-based design to successfully complete projects. Her work covers a wide range of project and client types from workplace to science facilities to higher education centers. Leonora brings clients’ goals to life through visioning sessions where she identifies, researches and implements innovative design solutions from feasibility studies all the way to interior finish selections. 

Dan Ringler, CID | Dan Ringler joined HED in 2020 with over twenty-seven years of experience in the delivery of complex repositioning and adaptive reuse projects. In his Project Director role, Dan leads integrated architectural and engineering design teams to develop and execute effective strategies for quality project execution, primarily in the corporate and commercial sectors. Dan’s industry knowledge and focus on client needs are integral in creating design solutions that benefit investors, developers, building owners, brokers and tenants.

Related Stories

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

Urban Planning | Apr 12, 2024

Popular Denver e-bike voucher program aids carbon reduction goals

Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.

Laboratories | Apr 12, 2024

Life science construction completions will peak this year, then drop off substantially

There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.

Multifamily Housing | Apr 12, 2024

Habitat starts leasing Cassidy on Canal, a new luxury rental high-rise in Chicago

New 33-story Class A rental tower, designed by SCB, will offer 343 rental units. 

boombox1 - default
boombox2 -
native1 -

More In Category

Construction Costs

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021